28th April 2025
Axis wins multiple Lots on new Retrofit and Decarbonisation framework
Axis won the following Lots for UK-wide works on LHC’s £120m Retrofit and Decarbonisation (N9) framework (2024-2028).
Workstream 3 Building Insulation:
Lot 8 Internal Insulation
Lot 9 Loft Insulation
Lot 10 Cavity Wall Insulation
Lot 11 External Wall Insulation
Workstream 4 Heating and Ventilation Systems:
Lot 14 Domestic Boiler Based Heating Systems
Lot 16 Commercial & Communal Heating Systems
Lot 17 District & Network Heating Systems
Lot 18 Electrical Heating Systems
Workstream 5 Building Control and Management Systems:
Lot 20 Building Management Systems
Workstream 6 Solar PV and Electrical:
Lot 22 Solar PV and Battery Storage
Lot 23 EV Charging
The new Retrofit and Decarbonisation (N9) framework is the successor to the Energy Efficiency Measures & Associated works (N8) framework, and supports local authorities, housing associations, education and other public sector organisations deliver a range of energy efficiency and decarbonisation works helping them with the challenge of achieving Net Zero and improving the EPC ratings of their stock.