Axis delivered an Exterior Cladding Project to the value of £900,000 for Peabody at Bridgestone House in 12 months.

Breadcrumbs:Home>Projects>Housing Projects>Exterior Cladding Project
  • Surveys

  • Weatherproof membrane

  • Design and installation new Vitradual cladding

  • Scaffolding

  • Removal of existing cladding

  • Replacement of timber decking

Click to download project case study | .pdf | 600 KB

Axis delivered an Exterior Cladding Project to the value of £900,000 for Peabody at Bridgestone House in 12 months.

Breadcrumbs:Home>Projects>Housing Projects>Exterior Cladding Project
  • Surveys

  • Weatherproof membrane

  • Design and installation new Vitradual cladding

  • Scaffolding

  • Removal of existing cladding

  • Replacement of timber decking

Click to download project case study | .pdf | 600 KB

Project Details

Peabody employed Axis to replace existing high-level cladding and private balcony decking with non-combustible materials at Bridgestone House, a six-storey block comprising 27 occupied flats on Blue Anchor Lane in Bermondsey south east London.

We conducted detailed investigation reports and surveys to scope out the design. Our Exterior Recladding Works involved removing the existing non-compliant external wall systems, balcony decking and soffits, and designing and installing a new Vitradual cladding system to current building regulations standards.

We replaced timber decking on the cantilever balconies with aluminium decking. A weatherproof membrane insulated the flats during the works. Regular design team meetings were held with client’s consultants and fire officers. Covid-19 caused shortage of materials but we, with a long-established supply chain, were in a good position to order/secure materials and reduce delays in our Exterior Recladding Works programme.

Care of our Residents

To minimise disruption to residents, we phased our work programme, beginning by replacing balcony decking whilst the cladding design procedure was in progress. The team then completed the cladding to the top penthouse apartments and removed scaffolding here before renewing cladding at the main communal entrance on Blue Anchor Lane.

All the works at Bridgestone House were carried out during the Covid-19 pandemic through which Axis followed Government Guidelines:  our employees wore appropriate PPE equipment, conducted hygiene and safety checks before entering residents’ homes, carried out regular cleaning and kept non-essential personal contact to a minimum.

Our Resident Liaison Officers kept residents fully informed about the works through personal house visits, regular poster announcements in communal areas as well as via personal email and hand-delivered newsletters and took special care with vulnerable residents. Where COVID-19 restricted our Open-Door policy in our Site Offices we provided updates via Zoom meetings and were available for Out of Hours meetings.

Project Details

Peabody employed Axis to replace existing high-level cladding and private balcony decking with non-combustible materials at Bridgestone House, a six-storey block comprising 27 occupied flats on Blue Anchor Lane in Bermondsey south east London.

We conducted detailed investigation reports and surveys to scope out the design. Our Exterior Recladding Works involved removing the existing non-compliant external wall systems, balcony decking and soffits, and designing and installing a new Vitradual cladding system to current building regulations standards.

We replaced timber decking on the cantilever balconies with aluminium decking. A weatherproof membrane insulated the flats during the works. Regular design team meetings were held with client’s consultants and fire officers. Covid-19 caused shortage of materials but we, with a long-established supply chain, were in a good position to order/secure materials and reduce delays in our Exterior Recladding Works programme.

Care of our Residents

To minimise disruption to residents, we phased our work programme, beginning by replacing balcony decking whilst the cladding design procedure was in progress. The team then completed the cladding to the top penthouse apartments and removed scaffolding here before renewing cladding at the main communal entrance on Blue Anchor Lane.

All the works at Bridgestone House were carried out during the Covid-19 pandemic through which Axis followed Government Guidelines:  our employees wore appropriate PPE equipment, conducted hygiene and safety checks before entering residents’ homes, carried out regular cleaning and kept non-essential personal contact to a minimum.

Our Resident Liaison Officers kept residents fully informed about the works through personal house visits, regular poster announcements in communal areas as well as via personal email and hand-delivered newsletters and took special care with vulnerable residents. Where COVID-19 restricted our Open-Door policy in our Site Offices we provided updates via Zoom meetings and were available for Out of Hours meetings.

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

More info

Other Property Sector Case Studies

Commercial
Social Housing
Public Sector
Heritage

About the Author: Joe Hayes

We’ve been providing exemplary property services to the housing sector for over 30 years. With experience on local authority projects and with distinguished housing association contracts, we deliver every single time. Get in touch using our contact form above.