Follow Us

 
The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.
Home | Case study | New Cold Water Pressure Booster System

New Cold Water Pressure Booster System

Sector

Social Housing

Location

London

Service

Refurbishment

Axis’ M&E Division installed a new cold water pressure booster system for our existing client, Tower Hamlets Community Housing (THCH).

Tower Hamlets Community Housing (THCH)

Upgraded a residential property in East London by installing a new cold water pressure booster system

Project Details

Axis’ M&E Division installed a new cold water pressure booster system for our existing client, Tower Hamlets Community Housing (THCH).

Our works improved the cold water pressure for residents (in Norton House, Bigland Street, east London) who had reported low pressure issues.

Axis’ experts drained and disconnected the water storage tanks at roof level, decommissioned the existing cold water down service, then installed the new cold water pressure booster system (pumps and tank) and also new cold water pipes to the pipework to the flats.

In addition, we converted six boilers to a sealed combi system that will adapt to the new system and ensure the building is suitable for mains-fed water.

Norton House is a fully-occupied residential block of flats. We kept disruption to a minimum for residents. And our regular newsletters kept them informed of our progress and about when they would be without water whilst we conducted the works.

Our new Cold Water Pressure Booster System provides an energy-efficient, high-performance and low-maintenance solution with better pressure and flow rate for residents and reduced costs for our client.

Benefits

  • Improved energy efficiency
  • Lower maintenance costs
  • High performance system
  • Enhanced water pressure and flow

Client Relationship

Our works for THCH include the delivery of remedial re-cladding works at a high-rise residential block in east London; and, via Via Fusion 21’s Reaction Repairs and Maintenance Framework Lot 1, a 5-year contract to conduct reactive repairs and maintenance, void property improvements and emergency and out of hours support.

Specifications

  • Drainage water storage tanks
  • Disconnection water storage tanks
  • Decommission existing cold water down service
  • Installation cold water pressure booster system
  • installation cold water pipes to pipework to the flats
  • Conversion six boilers to a sealer combi system

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

solar panels on grey asphalt roof

London Borough of Hounslow

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Millers Row, Essex

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...