Following a mini competition off the South East Consortium’s Internal and External Building Works Framework (Lot 1b, Major Refurbishments), the London Borough of Hammersmith & Fulham awarded Axis a major cyclical repairs and re-decoration project at Sulivan Court.

London Borough of Hammersmith & Fulham

Our one-year major cyclical repairs and re-decoration project at Sulivan Court for The London Borough of Hammersmith & Fulham is valued at £5.5m.

Project Details

Following a mini competition off the South East Consortium’s Internal and External Building Works Framework (Lot 1b, Major Refurbishments), the London Borough of Hammersmith & Fulham awarded Axis a major cyclical repairs and re-decoration project at Sulivan Court.

Sulivan Court is a large social housing estate in a conservation area in Fulham, London SW6. Under Phase 1 of the works programme, we completed six of the 19 blocks on the estate. The blocks are of solid brick construction with external walkways and balconies. They range from five-storeys (each housing 19 residents) to an eight storey (housing 71 residents).

Our Cyclical Repairs and Re-decoration works here included brick work and concrete repairs, waterproofing and repointing. We grit-blasted all concrete surfaces, repaired defective concrete and applied a coating to prevent further corrosion. Roof works included chimney pot replacements and removal of parapet stones. We replaced doorsets to balconies, and on the walkways, we removed corroded posts, then supplied and fitted replacement cast iron posts welding them to the handrail.

Prior to painting with two coats of Thermo guard smoke and flame retardant paint, we made good all previously painted external, rendered, plastered and concrete surfaces including external walls and balcony areas including soffits and fascias. We also redecorated the tiles adjacent to front doors. In addition, we painted pipework, columns, handrails, railings, emergency escape staircases, communal entrance doors and gates with Dulux Trade Metalshield gloss finish.

Our fire safety works included the installation of LED emergency lighting to all common areas, including external areas, entrance lobbies, staircases and corridors as well as the replacement of existing doors with Gerda ‘Safer Homes’ FD60s complete doorsets including architrave and ironmongery.

We conducted repair works to PVC-U external balcony door sets and windows and also to the bullseye communal windows in the communal stairwells, reinstating wire mesh to prevent birds from nesting.

Elsewhere we flushed all rainwater goods to ensure they were free of blockages; extended all boiler flues; removed and re-sited satellite dishes repaired and repainted the bin store doors; and replaced extractor fans.

Finally, prior to striking scaffold, we jet-washed all areas of brickwork, concrete and walkways to all elevations, removing any loose debris and cleaning the facade. We also washed down all windows for a final polish.

Find more of our housing projects, here.

Specifications

  • Brickwork and concrete repairs
  • Roof works
  • Balcony and walkways repairs
  • Doors and windows
  • Painting and Decorating
  • Fire Safety Works

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Union Central Buildin: Fire Protection Upgrade & New Sprinkler System

Axis delivered a £280,000 fire protection upgrade at Union Central Building in East London for William Martin Property Consultants Ltd,...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.