Metropolitan Police
Client Name
Public Sector
Sector
London
Location
Refurbishment
Category

Axis completed a £3.5m bespoke refurbishment of the Metropolitan Police Vehicle Workshops offices in 6 months

  • Structural alterations

  • Strip out gas fired boilers and heating systems

  • New VRF cooling and heating system decarbonisation works

  • New ceilings

  • Complete M&E strip out and renewal

  • New flooring

  • New fire doors

  • Complete passive fire stopping throughout

  • New security doors

  • Full internal decorations

  • New CCTV, access control and security alarm system

  • New LED lighting

  • Complete electrical strip-out, renewal of power/data, including distribution boards

  • Full garage fitout – mechanical vehicle lifts and tyre fitting bays/wheel alignment

  • Installation MOT automated test lane including brake testing

  • New light weight fast action speed shutters to all 12 vehicle bays

Click to download project case study

Axis completed a £3.5m bespoke refurbishment of the Metropolitan Police Vehicle Workshops offices in 6 months

  • Structural alterations

  • Strip out gas fired boilers and heating systems

  • New VRF cooling and heating system decarbonisation works

  • New ceilings

  • Complete M&E strip out and renewal

  • New flooring

  • New fire doors

  • Complete passive fire stopping throughout

  • New security doors

  • Full internal decorations

  • New CCTV, access control and security alarm system

  • New LED lighting

  • Complete electrical strip-out, renewal of power/data, including distribution boards

  • Full garage fitout – mechanical vehicle lifts and tyre fitting bays/wheel alignment

  • Installation MOT automated test lane including brake testing

  • New light weight fast action speed shutters to all 12 vehicle bays

Click to download project case study | .pdf | 600 KB

Project Details

Axis undertook a fast-track full fit out of the Metropolitan Police Ponton Road vehicle workshop and offices.

Our client had to vacate their previous building at the end of its lease and relocate their mechanics and engineers who look after the Metropolitan Police’s extensive range of vehicles.

We completed a full refurbishment of the administration block, transforming it into modern offices and welfare facilities.

Works included the installation of a new VRF cooling and heating system, full re-wire of power and data new containment, new LED lighting, plus full mechanical, electrical and plumbing installations throughout.

Works also included new access control and CCTV to the building along with external security doors and internal fire doors.

We undertook some demolition and constructed new walls for a new improved office layout.

We also fully decorated and installed new flooring throughout, including non-slip resin flooring to the workshop areas and parts stores, all designed to improve staff facilities.

The garage facilities included new high-tech Dura workstations, new vehicle lifts, exhaust extraction, compressed air and oil lines.

In addition, we installed the latest Hunter wheel alignment system and MOT Automated Test Lane (ATL, a specialised testing bay designed for one-person operation).

Our new CCTV and security alarms enhance safety and security across the entire site. Furthermore, new external LED lights added to the car park to improve visibility and safety for both staff and visitors. Access control systems across all areas ensure secure and controlled entry to the premises.

Starting in November 2024, both Axis and our supply chain partners worked extended hours and weekends to meet the tight deadlines and deliver the project on time, to facilitate the Metropolitan Police Fleet Services team being able to relocate and occupy their new premises on schedule.

Overall, this project was a major success, with Axis delivering all works to a high standard, on time, and to the full satisfaction of the Metropolitan Police.

The Workshop was officially opened on 3 September 2025 by Commissioner of the Metropolitan Police Sir Mark Rowley, QPM; and the Reverend Prebendary Sir Jonathan Osborne OBE, Senior Chaplain to the Metropolitan Police.

Benefits

  • Decarbonisation
  • Energy efficiency
  • Modernisation
  • Enhanced functionality
  • Improved efficiency in Fleet operations
  • Enhanced safety and security

Client Relationship

Axis is proud to have worked with the Metropolitan Police Service since 2013 and, to-date, we have successfully been appointed to their Lot 1 Contractor Framework for the past 3 terms.

Have a project to discuss?

Want to speak to a member of our Public Sector team?

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

Other Property Sector Case Studies

About the Author: Kaia Fukino