Axis carried out works for JLL in 4 locations; including internal maintenance and repairs

Project Outline

25 Bank Street and Canary Wharf

Axis carried out small works and maintenance at 25 Bank Street and Canary Wharf where several windows were broken due to Extinction Rebellion protests. Axis installed 10mm Polycarbonate directly to the exterior windows as a protection sheeting.

The Extinction Rebellions were also due to protest after the works were done therefore Axis supplied temporary fencing to close off the main reception for 6 weeks during.

60 Victoria Embankment High School of London

Axis completed the project of turning a wasted office space into a fully functional multi faith area. The team installed two ablution rooms along with prayer rooms and joinery shoe racks.

125 London Wall

Axis carried out a full fire door survey across 5 cores of the 3 tower blocks, remedials to fire doors were completed, installing 38 new fire door closers to ensure all door passed the fire door inspection.

Riverside South

This site is being developed for two new tower blocks for the staff of JP Morgan. Axis completed a full site perimeter hoarding to withstand the wind and sea air coming direct along the river. We also conducted a full site clean clearing any redundant materials left by contractors, weeds and brambles were also removed from site.

Project location: Four locations; 25 Bank Street and Canary Wharf, 60 Victoria Embankment (High School of London) 125 London Wall, Riverside South.

Project value:

  • 60 Victoria Embankment – £81k
  • 25 Bank Street and Canary Wharf – £60k
  • 125 London Wall – £20k
  • Riverside South – £60k