Follow Us

 

About Us

Trusted property maintenance specialists serving multiple sectors

Learn More

Plant room installation with white boiler and copper pipes
Home | Case study | Leeds City Council – Multi-site Decarbonisation Programme

Leeds City Council Multi-site Decarbonisation Programme

Sector

Local Authorities/Govt.

Location

Leeds

Service

Decarbonisation

Leeds City Council employed Axis as Principal Contractor for the installation of Salix grant-funded Public Sector Decarbonisation Scheme (PSDS 3b and 3c) Air Source Heat Pumps (ASHPs) and Water Source Heat Pumps (WSHPs) at 17 sites.

Additional installed solutions in the programme include Building Management System (BMS) upgrades and zonal controls, new sub stations and Distribution Network Operator (DNO) upgrades, and roof and ground-mounted solar PV.

The sites include leisure centres, heritage sites, a council vehicle servicing depot, schools and a care centre for adults with disabilities.

Vehicle Fleet Depot

Axis delivered a low-carbon upgrade at the Torrs Road Vehicle Fleet Depot, installing a 31.5kWp solar PV system generating 25,000 kWh annually alongside Air Source Heat Pumps. The project reduces CO₂ by over 4 tonnes per year .

Aquatics Centre

At Leeds Aquatics Centre, Axis designed and implemented a hybrid low-carbon heating solution, replacing gas boilers with Water Source Heat Pumps and integrating refurbished Air Source Heat Pumps into a two-stage system.

Otley Chippindale Pool

Axis delivered a fully decarbonised heating solution at Otley Chippindale Pool, removing gas entirely and installing new Air Source Heat Pumps, a 3000-litre buffer vessel and an upgraded BMS.

Brudenell Primary School

Axis successfully delivered a complex decarbonisation scheme at Brudenell Primary School installing new Air Source Heat Pumps, infrastructure and full system upgrades.

Temple Newsam

At the Grade I listed Temple Newsam site, Axis installed a low-carbon heating system including Air and Water Source Heat Pumps, new BMS and upgraded infrastructure, carefully navigating heritage constraints.

See more about these successful projects in our case study below.

What we did

The £9 million 3-year multi-site decarbonisation programme supports Leeds City Council’s Net Zero ambition by cutting emissions, lowering energy costs, and upgrading buildings with modern, efficient low-carbon heating systems.

Specifications

  • 17 sites include leisure centres, heritage sites, schools, a council vehicle servicing depot and a care centre for adults with disabilities
  • Air Source Heat Pumps (ASHPs)
  • Water Source Heat Pumps (WSHPs)
  • Building Management Systems (BMS) and zonal controls
  • Low Temperature Hot Water (LTHW) heating systems
  • Distribution Network Operator (DNO) upgrades
  • Roof and ground-mounted solar PV
  • Associated works including plant room, sub stations and insulation
  • Funded by Salix PSDS Phase 3b and Phase 3c
  • Procured via Procurement for Housing’s (PfH) Decarbonisation and Retrofit framework 2023-2027
  • Value £9m
  • Duration 3 years

Project Overview

Duration of Contract

3

years

Number of sites

17

Value of Contract

£

9

million

Salix funding schemes enable the public sector to reduce carbon emissions in line with the UK Government’s commitment to becoming Net Zero by 2050. Projects funded through PSDS schemes, are designed to deliver carbon reductions of 40%+ across the estate while reducing operational costs and tackling fuel poverty.

Axis won this contract via Procurement for Housing’s Decarbonisation and Retrofit framework 2023-2027, after an evidenced-based selection process, including client referrals and interview.

Leeds City Council, as part of its new Leeds Ambitions roadmap, is working towards becoming the UK’s first Net Zero and Nature Positive city, reducing carbon emissions and restoring nature, and supporting people and businesses to make increasingly sustainable choices while making homes easier and more affordable to heat, and reducing fuel poverty and cold-related illness.

Innovations, challenges, solutions

Our flexible, carefully phased approach minimised disruption and maintained access for all users. Traffic and site delivery management plans additionally ensured the safety of all personnel and the public.

We were delighted to win this contract with Leeds City Council to reduce carbon emissions across 10 sites, supporting them in their aim to be the UK’s first Net Zero and Nature Positive city.

“Our proven track record with ASHP and Solar installations throughout the UK provided evidence of our experience in this sector. And our teams are on hand to expedite the programme as quickly as possible with minimum inconvenience to residents and the users of the sites.

Alan Noble, M&E Director

Axis

Have a project to discuss?

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn