Follow Us

 
Home | Case study | Full Refurbishment

Full Refurbishment

Sector

Blue Light

Location

London

Service

Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our client

Metropolitan Police

Axis completed a £3.5m bespoke refurbishment of the Metropolitan Police Vehicle Workshops offices in 6 months

Project Details

Axis undertook a fast-track full fit out of the Metropolitan Police Ponton Road vehicle workshop and offices.

Our client had to vacate their previous building at the end of its lease and relocate their mechanics and engineers who look after the Metropolitan Police’s extensive range of vehicles.

We completed a full refurbishment of the administration block, transforming it into modern offices and welfare facilities.

Works included the installation of a new VRF cooling and heating system, full re-wire of power and data new containment, new LED lighting, plus full mechanical, electrical and plumbing installations throughout.

Works also included new access control and CCTV to the building along with external security doors and internal fire doors.

We undertook some demolition and constructed new walls for a new improved office layout.

We also fully decorated and installed new flooring throughout, including non-slip resin flooring to the workshop areas and parts stores, all designed to improve staff facilities.

The garage facilities included new high-tech Dura workstations, new vehicle lifts, exhaust extraction, compressed air and oil lines.

In addition, we installed the latest Hunter wheel alignment system and MOT Automated Test Lane (ATL, a specialised testing bay designed for one-person operation).

Our new CCTV and security alarms enhance safety and security across the entire site. Furthermore, new external LED lights added to the car park to improve visibility and safety for both staff and visitors. Access control systems across all areas ensure secure and controlled entry to the premises.

Starting in November 2024, both Axis and our supply chain partners worked extended hours and weekends to meet the tight deadlines and deliver the project on time, to facilitate the Metropolitan Police Fleet Services team being able to relocate and occupy their new premises on schedule.

Overall, this project was a major success, with Axis delivering all works to a high standard, on time, and to the full satisfaction of the Metropolitan Police.

The Workshop was officially opened on 3 September 2025 by Commissioner of the Metropolitan Police Sir Mark Rowley, QPM; and the Reverend Prebendary Sir Jonathan Osborne OBE, Senior Chaplain to the Metropolitan Police.

Benefits

  • Decarbonisation
  • Energy efficiency
  • Modernisation
  • Enhanced functionality
  • Improved efficiency in Fleet operations
  • Enhanced safety and security

Client Relationship

Axis is proud to have worked with the Metropolitan Police Service since 2013 and, to-date, we have successfully been appointed to their Lot 1 Contractor Framework for the past 3 terms.

Specifications

  • Structural alterations
  • Strip out gas fired boilers and heating systems
  • New VRF cooling and heating system decarbonisation works
  • New ceilings
  • Complete M&E strip out and renewal
  • New flooring
  • New fire doors
  • Complete passive fire stopping throughout
  • New security doors
  • Full internal decorations
  • New CCTV, access control and security alarm system
  • New LED lighting
  • Complete electrical strip-out, renewal of power/data, including distribution boards
  • Full garage fitout – mechanical vehicle lifts and tyre fitting bays/wheel alignment
  • Installation MOT automated test lane including brake testing
  • New light weight fast action speed shutters to all 12 vehicle bays

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

MHS – Roof Repairs and Maintenance Works

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...