Peabody Trust
Client Name
Housing
Sector
London
Location
Refurbishment
Category

This bathroom extension work was valued at £1.4m across 12 weeks

Breadcrumbs:Home>Projects>Housing Projects>Bathroom Extension Project
  • Deconstruction of original extension

  • Installation of pre-built steel pods

  • Plumbing and electrical works

  • Brick slip cladding

  • Drainage and groundworks

  • Helical foundation supports

Click to download project case study | .pdf | 600 KB

This bathroom extension work was valued at £1.4m across 12 weeks

Breadcrumbs:Home>Projects>Housing Projects>Bathroom Extension Project
  • Deconstruction of original extension
  • Installation of pre-built steel pods

  • Plumbing and electrical works

  • Brick slip cladding

  • Drainage and groundworks

  • Helical foundation supports

Click to download project case study | .pdf | 600 KB

Project Details

This innovative bathroom extension project for the Peabody Trust, saw traditionally built bathroom extensions with pre-manufactured steel pods. Our dedicated housing sector provided the pods, complete with new bathroom suites, fixtures and fittings already installed.

We used the easier-to-install pod system on 11 properties, which is estimated to have saved the programme over eight weeks. This reduced resident disruption and impact on the local community. Our team also came up with an equally creative but robust solution for re-establishing the foundations on which the pods would sit, which also contributed to time-saving. We hammered four steel rods (helical supports) several metres deep into the ground to support the corners of each pod.

Our team then craned the pods in and secured them into place, adjoining the properties. We installed the appropriate electrical, water and drainage connections. The team completed this bathroom extension project by restoring the patios, gardens and surrounding areas to their original condition.

Read more about our housing sector projects, here.

Project Details

This innovative bathroom extension project for the Peabody Trust, saw traditionally built bathroom extensions with pre-manufactured steel pods. Our dedicated housing sector provided the pods, complete with new bathroom suites, fixtures and fittings already installed.

We used the easier-to-install pod system on 11 properties, which is estimated to have saved the programme over eight weeks. This reduced resident disruption and impact on the local community. Our team also came up with an equally creative but robust solution for re-establishing the foundations on which the pods would sit, which also contributed to time-saving. We hammered four steel rods (helical supports) several metres deep into the ground to support the corners of each pod.

Our team then craned the pods in and secured them into place, adjoining the properties. We installed the appropriate electrical, water and drainage connections. The team completed this bathroom extension project by restoring the patios, gardens and surrounding areas to their original condition.

Read more about our housing sector projects, here.

Click to view our Charity ball program 2021

Other Property Sector Case Studies

Commercial
Social Housing
Public Sector
Heritage

About the Author: Joe Hayes

We’ve been providing exemplary property services to the housing sector for over 30 years. With experience on local authority projects and with distinguished housing association contracts, we deliver every single time. Get in touch using our contact form above.