Follow Us

 
A long, elegant terrace of London period properties after a cyclical external decoration project, showcasing the freshly painted white window surrounds and balconies against the traditional brickwork.
Home | Case study | Cyclical External Decoration

Cyclical External Decoration

Sector

Social Housing

Location

London

Service

Responsive Repairs

Axis was employed to complete cyclical external decoration for our long-term client, Notting Hill Genesis. Our repairs and maintenance team carried out the repairs at properties on Newton Road, within a Heritage Westminster conservation area, in London. This project has been split into two case studies, the counter-part which looks at the roof works carried out for NHG as part of the same contract can be found here.

Notting Hill Genesis

We delivered cyclical external decorations across 5-years, at a value of £3 million

Project Details

Our team began work by conducting an asbestos survey of the properties, which are a mixture of houses and flats. The team then proceeded with the external maintenance programme. We removed all failed render and re-skimmed, reforming all the original exterior details. Next, we replaced the sections of balcony railings that were missing, loose, and in some instances dangerous. This came alongside fitting renewed spindles and any missing fleurs-de-lys from the ground floor railings. The team then renewed all original timber sash windows with new double-glazed heritage units. We also restored the front doors and frames with new Victorian-style timer doors.

Some balconies were leaking, so we renewed all the asphalt to the balconies and drip edge details. In addition, we removed and renewed the asphalt steps. The team fully re-plastered and decorated all communal areas, with new carpets installed. We installed Aereco ventilation units into the flats, which are designed to manage moisture content.

Project Challenges

The main challenge we faced in this cyclical external decoration project was Notting Hill Carnival. No scaffolding can be left erected over the weekend of the celebrations, so we had to ensure the timely dismantling of the scaffolding before re-erecting it for further work. Another minor challenge to the project was inclement weather, which posed issues for painting as is usually the case in Winter. However, these are common challenges that our team expects to overcome with relative ease.

Works were spread across the boroughs of Kensington and Chelsea, Hammersmith and Fulham, and Westminster. Projects within suburban areas always bring challenges regarding residents, schools, and restricted access. However, our dedicated Resident Liaison Officers keep regular contact with residents, managing queries as well as ensuring regular client updates.

Our team produced an extremely high quality of workmanship throughout, and the cyclical external decoration programme ran on time, to budget, and to the client’s satisfaction. Our contract with Notting Hill Genesis is in its fifth and final year, and they have awarded us future projects due to the success and quality of the work completed.

Specifications

  • Asbestos survey
  • Removal and replacement of failed render
  • Renewal of spindles and missing fleurs-de-lys
  • Renewal of original timber sash windows
  • Re-plastering and decoration of communal areas
  • Installation of Aereco ventilation units

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.