Follow Us

 
A newly fitted modern kitchen with grey cabinets, white subway tile backsplash, and integrated appliances, part of a property deconversion and energy efficiency upgrade.
Home | Case study | Deconversion and Improved Energy Efficiency Programme

Deconversion and Improved Energy Efficiency Programme

Sector

Social Housing

Location

London

Service

Decarbonisation

We are conducting a Deconversion and Improved Energy Efficiency Programme across ten properties in West London for our client Westminster City Council. 26 Fourth Avenue is the first property in our programme.

Westminster City Council

Our 16-week Deconversion and Improved Energy Efficiency Programme increased the living space of the property to enable our client Westminster City Council to house a larger family.

Project Details

Our 16-week Deconversion and Improved Energy Efficiency Programme, valued at £300,000, increased the living space of the property to enable our client Westminster City Council to house a larger family.

We converted the house from four bedrooms to five and added a new shower room with toilet and handbasin. And to improve the thermal efficiency of the building, we completely replaced the gas with electric heating and hot water systems and fully insulated interior walls and loft.

Scope of Works

  • Conversion from 4-bed to 5-bed house
  • Full strip out
  • Levelling internal flooring and ceilings
  • Structural works including moving walls
  • Disconnection of all gas
  • New PV panels/Inverter/Battery
  • New TRUST Neos radiator system
  • New Thermino heat batteries for hot water –Sunamp UK
  • Kitchen upgrade
  • Bathroom upgrade (upstairs)
  • New downstairs shower room
  • Secondary glazing installation
  • Internal wall insulation (120mm SWIP)
  • SMART Airex Ventilation Control bricks
  • 400mm loft insulation
  • New composite rear door
  • Timber sash window overhauls
  • Full external façade repairs and redecoration
  • LED lighting
  • New electric underfloor heating
  • New humidistat extractor fans
  • LD2 fire alarm system (smoke/heat detectors)
  • Garden paving and landscaping
  • New carpets and wood flooring
  • Painting and decorating

Works in detail

Our structural works included moving walls, removing chimney stacks and repairing and laying new flooring. To allow the property to become DDA compliant if needed in the future, we also widened corridors. Our Internal Wall Insulation (120mm SWIP) consists of thermally engineered composite studs and insulation slabs which can produce a thermal performance improvement of over 80%. We also insulated the loft.

The property is now fully electric. After disconnecting the gas, we installed a new electrical solar inverter which converts the electricity captured by the new Solar Panels, charging the batteries which are housed in the garden. A new, innovative and award-winning TRUST Neos Electric Radiator LP3 system keeps the property at a comfortable and controllable temperature reducing heating costs significantly. And New Thermino heat batteries for hot water – Sunamp UK – replace traditional hot water cylinders and provide a thermal energy storage solution with a minimal heat loss rate.

We completely upgraded the kitchen adding brand new appliances (tall fridge/freezer, dishwasher, washing machine, cooker hob and oven) and installing LED lighting as well as LD2 fire alarm system (smoke/heat detectors). There is underfloor heating to the kitchen vinyl flooring and secondary glazing to the large window over the kitchen sink, while a composite double glazed back door to the garden provides added security and increased thermal efficiency.

We also created a brand-new shower room (featuring a new walk-in shower as well as a toilet and a basin). Further additions in the shower room include new windows and LED lighting, an efficient extraction system to keep condensation at bay and underfloor heating to the vinyl flooring, and a tower rail.

Our team installed SMART Airex Ventilation Control bricks which control air flow to reduce heat loss while ensuring sufficient ventilation to prevent condensation. By reducing draughts and making the underfloor space warmer, the bricks improve the U-value (the rate of transfer of heat). We laid a new concrete floor to the side elevation of the property and then also cleaned and re-bedded paving slabs to the rear section of the property. The garden also features the housing for the batteries which are connected to the PV panels to provide power to the property. Our team then carried out decorations to all the walls and windows.

To finish off the Deconversion and Improved Energy Efficiency Programme we painted and decorated throughout, and carried out repairs to the banister and the balustrades. We created storage space under the stairs, installed LD2 fire alarm system (smoke/heat detectors) to the ceilings, repaired and restored the sash timber windows and added new carpets/wooden flooring.

Benefits

  • Increased and enhanced living space for larger families
  • Potential 80% thermal efficiency improvement
  • Potential 30% reduction in heating costs
  • Improved U-value (rate of transfer of heat)
  • Reduced carbon footprint
  • Better light, insulation and ventilation
  • A safe and comfortable home
  • Futureproofing
  • Assists our clients achieve Net Zero targets

Client Relationship

Axis has delivered planned maintenance to City of Westminster’s 21,000 properties since 2012, improving the safety, comfort and environmental performance of residents’ homes. Our contract, which has been extended twice, has included cyclical decorations and renewal works to roofs, windows, external structures and internal communal areas, as well as kitchen and bathroom and fire door replacements, solar panel installation and a ten-property deconversion programme.

Specifications

  • Conversion from 4-bed to 5-bed house
  • Full strip out
  • Structural works
  • New PV panels/Inverter/Battery
  • New TRUST Neos radiator system
  • New Thermino heat batteries
  • New shower room
  • Internal wall and loft insulation
  • Garden landscaping
  • Internal and external painting and decorating

Inherently, the properties are small in footprint and the unique design principles have allowed us to maximise the space and to provide much-needed homes to the citizens of the City of Westminster.

Axis’ supply chain and management have allowed this to work seamlessly. Their rigorous approach to their programming and sequencing of works has allowed us to meet our deadlines

Jeff Tourmentin, Head of Capital Investment Programme

Westminster City Council

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.