As a trusted repairs and maintenance provider for the social housing sector, Axis delivered a refurbishment of a fire-damaged two-bedroom flat at 22 Goldcrest House, London, on behalf of our client, L&Q.

L&Q

Restoring a fire-damaged two-bedroom flat in London to be safe and fire compliant, delivered over 5 months with a value of £80,000

Project Details

As a trusted repairs and maintenance provider for the social housing sector, Axis delivered a refurbishment of a fire-damaged two-bedroom flat at 22 Goldcrest House, London, on behalf of our client, L&Q.

Under our partnering contract, works commenced with a full strip-out of all materials affected by fire damage. This included the removal of fire-damaged walls, ceilings, and flooring, along with all fixtures, fittings and furnishings that had been contaminated by smoke and soot. A specialist deep cleaning and decontamination process was undertaken to eliminate smoke residue and odours throughout the property.

Following the cleaning and decontamination, the structural elements of the flat were assessed to ensure it met current safety regulations. Mechanical and electrical systems, including wiring, plumbing, and heating were evaluated and replaced. Fire-stopping services were implemented to prevent the spread of fire, such as new insulation and plasterboard were installed across all windows and ceilings to reinstate the internal structure.

The property underwent a full internal refurbishment, including redecoration, new flooring in every room, and the ceiling was replaced, along with upgraded fire compliant balcony doors. The flat was deep cleaned and finished to a high standard, bringing it back to a safe, habitable condition, fully aligned with current fire regulations and fire stopping requirements.

Benefits

  • Future proofing against further repairs
  • Internal doors upgraded to fire doors
  • Liquid coated the balcony floor to enhance safety
  • Compliant with fire regulations

Client Relationship

Our strong foundation, and long-standing partnership with L&Q continues to thrive over the years.

Eloise Green-Stone, Delivery Programme Lead at L&Q commented:

Specifications

  • Strip-out and removal of fire damaged materials
  • Deep cleaning and decontamination
  • M&E works
  • Installation of insulation and plasterboard
  • Replacement of balcony ceiling, doors, flooring
  • Internal redecoration

We are extremely pleased with the outstanding work carried out by Axis on Goldcrest House. Following the unfortunate fire, the property required a full refurbishment, including all fixtures and finishes for the two-bedroom flat.

From start to finish, the team demonstrated exceptional professionalism, efficiency, and attention to detail. They managed the entire restoration process seamlessly, ensuring that every aspect of the refurbishment met the highest standards.

The quality of workmanship was impeccable, with the final result exceeding our expectations. Your commitment to delivering on time and within budget was commendable, and your proactive communication kept us informed at every stage. We look forward to working together on more complex projects.

Eloise Green-Stone

Delivery Programme Lead

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System