Hot Water and Heating System

Sector

Social Housing

Location

East of England

Service

Decarbonisation

For our client Sanctuary, Axis delivered a new hot water and heating system for 23 one-bedroom flats (plus one two-bedroom family flat) across three floors and a communal lounge and laundry room at Dove Cott House in Essex.

Sanctuary

Our team installed a new hot water and heating system for 23 flats as well as a modern playground

Project Details

Our M&E team undertook this comprehensive project to upgrade the hot water and heating system in the flats, starting with the disconnection and removal of the existing hot water cylinders in each flat.

To ensure enhanced energy efficiency and reliability, we installed new Heat Interface Units (HIUs) in every flat. This upgrade included the installation of a new Low Temperature Hot Water (LTHW) pipework distribution system, extending from the existing plant room’s secondary circuit to the newly implemented LTHW system and HIUs in each flat.

We made significant modifications to the existing LTHW and Mains Cold Water (MCW) pipework within the plant room, ensuring seamless integration with the new hot water and heating system. Additionally, our M&E team carried out adjustments on the existing LTHW and Cold-Water Storage (CWS) / Hot Water Storage (HWS) connections to the underfloor manifold, including the removal of 2-port valves from the underground manifolds to optimise performance.

Further enhancements involved the installation of Thermostatic Mixing Valves (TMVs) to regulate bathroom hot water outlets within each flat and communal areas, ensuring safe and consistent water temperatures. To meet safety standards, we insulated and boxed in the newly-installed heating pipework. And to support the system’s functionality, we installed a 600-litre thermal vessel in the cleaner’s room, linked to the existing 300-litre store in the plant room.

The project also encompassed all necessary electrical works associated with the new installation.

We removed and safely disposed of redundant materials, minimising environmental impact. Our team completed general builders’ works and flushed and chemically cleaned the entire system.

Overall, this £250,000 project for a new hot water and heating system is set to provide long-term benefits to the residents, offering a modern, efficient, and reliable hot water and heating system in their flats.

Key

  • HIU – Heat Interface Unit
  • LTHW – Low Temperature Hot Water
  • MCW – Mains Cold Water
  • CWS – Cold Water System
  • HWS – Hot Water System
  • TMV – Thermostatic Mixing Valve
  • WHB – Wash Hand Basin

Benefits

  • Efficient high performance energy consumption
  • Low maintenance / future proofing
  • Reduced costs
  • Lower carbon footprint

Community Contribution

The property provides supported accommodation for single, young women who are pregnant or have a child or children, referred to Dove Cott by Basildon Council.

And so, Sanctuary requested our assistance in enhancing the outdoor space at Dove Cott House by installing a new playground for the residents’ children.

Axis’ Responsible Business Team, with support from the Travis Perkins Community Found, eagerly supported this initiative.

Volunteers from Sanctuary and Axis collaborated to excavate and clear the space, repair and paint fences as well as install new paving slabs, artificial grass and attractive planting to transform the space.

Safeplay Playgrounds contributed by installing a play panel station, talk tubes, and game panels designed to promote sensory, educational, and imaginative play, alongside climbing and swinging activities. This playground project successfully provided a new, safe space for children to play and enjoy.

Client Relationship

Our 15-year contract with Sanctuary, delivering responsive repairs services across London, East, and Southeast England. We manage a budget of £18 million per annum across 11,000 properties, handling an estimated 63,000 repairs annually. Recent customer satisfaction levels are consistently over 93.7% with over 96.42% of appointments kept and minimal no access issues.

Specifications

  • Removal of existing hot water cylinders
  • New HIUs and LTHW pipework
  • Modifications to LTHW and MCW pipework in the plant room
  • TMVs in bathroom hot water outlets
  • Installation and boxing in of new heating pipework
  • 600-litre thermal vessel link to thermal store
  • Electrical and general builder’s works
  • System flushing, chemical cleaning, water sampling

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.