Follow Us

 
Energy-efficient housing retrofit project showcasing sustainable refurbishment and low-carbon design.
Home | Case study | Pilot Retrofit Project, Conversion and Refurbishment

Pilot Retrofit Project, Conversion and Refurbishment

Sector

Social Housing

Location

London

Service

Decarbonisation

Axis’ Projects Division undertook a Retrofit project including conversion and refurbishment works for Westminster City Council (WCC).

Westminster City Council

We completed our £230,000 retrofit project, which included conversion and refurbishment works to create a family home, in just four months

Project Details

WCC received funding under the Social Housing Decarbonisation Fund (SHDF) for this project and are planning to retrofit 560 homes under SHDF Wave 2.

Our Retrofit project works included the installation of PV panels, ventilation, infra-red central heating systems, double glazing and insulation.

And our Refurbishment works which included demolition and installation of new internal walls and flooring, created a four bedrooms family house with a large kitchen: a home that is comfortable and spacious and also also economical and sustainable for our client and the residents.

The Victorian house – which previously comprised two flats – is at 13 Fourth Avenue, London W10 in the Queen’s Park conservation area.

Whilst thoroughly modernising the property, which was originally converted into flats in the 1980s, our team carefully restored original period features including the front door and the railings.

Benefits

  • 50% reduction in heat loss
  • Helps client achieve Net Zero targets
  • EPC D raised to EPC C
  • Spacious family home with four bedrooms and family kitchen that is practical, comfortable and sustainable

Retrofit project works

  • Roof PV panels, invertor and storage battery
  • New smart vents/air bricks
  • New powder coated aluminium double glazed back door
  • Replacement rear extension timber windows with double glazed aluminium windows
  • Secondary glazing to existing timber sash windows
  • M&E works include full electric rewire, removal/disconnection of gas

Refurbishment project works

  • Brick work and repointing
  • Painting and decorating
  • Timber work and fencing
  • Landscaping
  • Roof repairs
  • Internal walls – demolition and reposition with plasterboard fitted with mineral fibre quilt insulation + new timber skirting boards
  • Adding/repositioning doorways, doors, frames, lintels and new RSJs
  • Removal of two chimney breasts and radiators
  • Underground drainage works
  • Full re-plaster
  • Creation of ground floor kitchen/dining and living space
  • Creation of four double bedrooms on first floor and a family bathroom
  • Installation of new kitchen and ground floor wet room
  • Installation of new softwood flooring to ground floor hallway
  • Fully carpeted
  • New white goods, cooker, washing machine, fridge/freezer

Client Relationship

Axis has delivered planned maintenance to City of Westminster’s 21,000 properties since 2012, improving the safety, comfort and environmental performance of residents’ homes. Our contract, which has been extended twice, has included cyclical decorations and renewal works to roofs, windows, external structures and internal communal areas, as well as kitchen and bathroom and fire door replacements, solar panel installation and a ten-property deconversion programme

Axis and Retrofit

Axis’ many fully-qualified Retrofit Co-ordinators can undertake government-funded retrofit works under PAS 2030: 2019. By gaining PAS 2030: 2019 certification, Axis’ retrofit installers demonstrate that they have installed Energy Efficiency Measures which meet the required specifications, and in accordance with TrustMark standards.

Specifications

  • Retrofit
  • Modernisation and conservation
  • Space reconfiguration to create family home
  • Roof works and PV panels
  • M&E – ventilation, invertor and storage battery
  • Windows and doors
  • Repointing and brickwork
  • Insulation

To successfully complete the project, we needed specific skills from Axis, primarily under the PAS 2035 retrofit standard. We needed a retrofit assessment and retrofit co-ordination to ensure that the works are done to the standard, and then the retrofit installation and the retrofit design skills as part of the installation. We were very pleased to have all that with Axis. This project has gone fantastically. I have been so surprised and amazed by the speed of delivery (four months) and the quick responses between Axis and Westminster. We have really worked well together, from the retrofit assessment – deciding what works we need to do to complete the best sustainability measures – to the actual installation which I was incredibly impressed by.

Anthony Jones

Head of Sustainability, Westminster City Council

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.