Axis delivers cladding remediation works to the value of £3.5 million for Peabody.

Breadcrumbs:Home>Projects>Housing Projects>Cladding Remediation Works
  • Pre-condition surveys

  • Removal and replacement of existing cladding

  • Scaffolding

  • Pull out tests

Click to download project case study | .pdf | 600 KB

Axis delivers cladding remediation works to the value of £3.5 million for Peabody.

Breadcrumbs:Home>Projects>Housing Projects>Cladding Remediation Works
  • Pre-condition surveys

  • Removal and replacement of existing cladding

  • 7-storey block

  • Scaffolding

  • Pull out tests

  • High-end apartments

Click to download project case study | .pdf | 600 KB

Project Details

Peabody’s Bristow Court is a 7-storey block containing 21 residential flats arranged over four floors on Triangle Road in Hackney East London. There are six flats on each of the first, second and third floors and three on the top floor. The high-end apartments are of mixed tenure and fully occupied, in the main, by professional leaseholders. The ground floor comprises commercial units.

Peabody appointed Axis for a two-stage JCT** intermediate contract with contractor’s design portion for the removal of existing non-compliant HPL cladding and renewal with new Rockpanel rainscreen cladding system.

Axis continued the cladding remediation works from a previous contractor who had stripped some of the existing cladding so there were issues of damp in some of the apartments. Therefore, prior to works commencing, we conducted pre-condition surveys to all properties to inspect damp and condensation issues; check all windows and gas installations as well as assess any vulnerabilities of residents. We also updated our contacts list to effectively communicate with residents throughout the works.

The team erected scaffolding for the duration of the cladding remediation works. The scaffold was fully alarmed with Robo Watch and had underlighting for full visibility and security. When the scaffold was erected, we conducted pull-out tests in preparation for removing existing cladding.

A railway line, which runs at the back of the block of flats, had to be closed for Axis to erect our scaffolding. We submitted a scaffold design to Network Rail and were able to continue works to the front of the building meanwhile.

To the front elevation the team replaced the cladding on the balconies and soffits with non-combustible cladding in a wood effect in keeping with existing style. To the rear elevation Axis removed existing cladding and installed Wetherby insulation system and Rock panel cladding.

Axis replaced cladding on the balconies with non-combustible cladding in a wood effect in keeping with existing style, including reinstated cladding and insulation to the sofitts on the balcony.

Care of our Residents

We kept residents fully informed prior to works commencing and throughout the duration of the works. COVID-19 restricted our usual Open-Door policy in our Site Office directly in front of the main entrance to Bristow Court, so we provided updates via Zoom meetings and regular announcements in communal areas and hand delivered Newsletters.

We were able to conduct the cladding works to the exterior of the building without accessing the interiors of the apartments so disruption to residents was kept to a minimum. Regular communications were additionally sent to residents about scaffold security.

Axis and Peabody always prioritised the safety of residents and, as these works were carried out during the Covid-19 pandemic, Axis staff wore appropriate PPE equipment, conducted hygiene and safety checks before entering residents’ homes; carried out regular cleaning and kept non-essential personal contact to a minimum. Axis followed government guidelines throughout the works.

Further works:

The team was contracted to do some extra on the project: roof works included fitting a handrail; and we also made good after works on the boilers were completed.

Find more of our housing projects, here.

Project Details

Peabody’s Bristow Court is a 7-storey block containing 21 residential flats arranged over four floors on Triangle Road in Hackney East London. There are six flats on each of the first, second and third floors and three on the top floor. The high-end apartments are of mixed tenure and fully occupied, in the main, by professional leaseholders. The ground floor comprises commercial units.

Peabody appointed Axis for a two-stage JCT** intermediate contract with contractor’s design portion for the removal of existing non-compliant HPL cladding and renewal with new Rockpanel rainscreen cladding system.

Axis continued the cladding remediation works from a previous contractor who had stripped some of the existing cladding so there were issues of damp in some of the apartments. Therefore, prior to works commencing, we conducted pre-condition surveys to all properties to inspect damp and condensation issues; check all windows and gas installations as well as assess any vulnerabilities of residents. We also updated our contacts list to effectively communicate with residents throughout the works.

The team erected scaffolding for the duration of the cladding remediation works. The scaffold was fully alarmed with Robo Watch and had underlighting for full visibility and security. When the scaffold was erected, we conducted pull-out tests in preparation for removing existing cladding.

A railway line, which runs at the back of the block of flats, had to be closed for Axis to erect our scaffolding. We submitted a scaffold design to Network Rail and were able to continue works to the front of the building meanwhile.

To the front elevation the team replaced the cladding on the balconies and soffits with non-combustible cladding in a wood effect in keeping with existing style. To the rear elevation Axis removed existing cladding and installed Wetherby insulation system and Rock panel cladding.

Axis replaced cladding on the balconies with non-combustible cladding in a wood effect in keeping with existing style, including reinstated cladding and insulation to the sofitts on the balcony.

Care of our Residents

We kept residents fully informed prior to works commencing and throughout the duration of the works. COVID-19 restricted our usual Open-Door policy in our Site Office directly in front of the main entrance to Bristow Court, so we provided updates via Zoom meetings and regular announcements in communal areas and hand delivered Newsletters.

We were able to conduct the cladding works to the exterior of the building without accessing the interiors of the apartments so disruption to residents was kept to a minimum. Regular communications were additionally sent to residents about scaffold security.

Axis and Peabody always prioritised the safety of residents and, as these works were carried out during the Covid-19 pandemic, Axis staff wore appropriate PPE equipment, conducted hygiene and safety checks before entering residents’ homes; carried out regular cleaning and kept non-essential personal contact to a minimum. Axis followed government guidelines throughout the works.

Further works:

The team was contracted to do some extra on the project: roof works included fitting a handrail; and we also made good after works on the boilers were completed.

Find more of our housing projects, here.

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

More info

Other Property Sector Case Studies

Commercial
Social Housing
Public Sector
Heritage

About the Author: Joe Hayes

We’ve been providing exemplary property services to the housing sector for over 30 years. With experience on local authority projects and with distinguished housing association contracts, we deliver every single time. Get in touch using our contact form above.