Islington Council
Client Name
Education
Sector
Copenhagen School
Location
Refurbishment
Category

A 9-week School Refurbishment Project created new indoor and outdoor space for pupils and teachers

Breadcrumbs:Home>Projects>Public Sector Projects>School Refurbishment Project
  • Landscaping and drainage

  • Window works

  • Redecoration, renewal and repairs

  • Office strip out and new AC

  • Asphalt repairs

  • Roof works

  • New playground fencing, equipment and planting

Have a project to discuss?

Want to speak to a member of our Social Housing team? Fill out our enquiry form and we’ll be in touch as soon as possible.

Enquire now

Our  9-week School Refurbishment Project created new indoor and outdoor space for pupils and teachers

Breadcrumbs:Home>Projects>Public Sector Projects>School Refurbishment Project

Have a project to discuss?

Want to speak to a member of our Social Housing team? Fill out our enquiry form and we’ll be in touch as soon as possible.

Enquire now
  • Landscaping and drainage

  • Window works

  • Redecoration, renewal and repairs

  • Office strip out and new AC

  • Asphalt repairs

  • Roof works

  • New playground fencing, equipment and planting

Click to download project case study | .pdf | 600 KB

Our School Refurbishment Project took just nine weeks to complete. Internally we redecorated as well as levelling the floor and introducing new blinds, cubicles, coat hooks and a small low level kitchen area. In the server room we installed a new air conditioning unit.

To the outdoor space on the roof we painted perimeter walls and jetwashed through all roof outlets to clear blockages.

In the playgrounds we repaired and repainted the playground boat and installed bright and colourful new rhino pencil fencing after clearing and disposing of much of the play equipment old equipment.

The installation of rubber mulch floor and artificial grass keeps the children safe as they play and enjoy our newly-created planting areas, whilst the playground trees are protected with our new resin surround to ensure their healthy and continued growth.

Find more Public Sector works here.

Click to download project case study

Our School Refurbishment Project took just nine weeks to complete. Internally we redecorated as well as levelling the floor and introducing new blinds, cubicles, coat hooks and a small low level kitchen area. In the server room we installed a new air conditioning unit.

To the outdoor space on the roof we painted perimeter walls and jetwashed through all roof outlets to clear blockages.

In the playgrounds we repaired and repainted the playground boat and installed bright and colourful new rhino pencil fencing after clearing and disposing of much of the play equipment old equipment.

The installation of rubber mulch floor and artificial grass keeps the children safe as they play and enjoy our newly-created planting areas, whilst the playground trees are protected with our new resin surround to ensure their healthy and continued growth.

Find more Public Sector works here.

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

More info

Other Property Sector Case Studies

Commercial
Social Housing
Public Sector
Heritage

About the Author: Marie Partner

Here at Axis, we don’t just work with clients. We build long-term, mutually beneficial partnerships. Whatever the sector – housing, commercial, heritage, or public property services, get in touch using the contact form above and tell us about your project.