Islington Council
Client Name
Education
Sector
Copenhagen School
Location
Refurbishment
Category
A 9-week School Refurbishment Project created new indoor and outdoor space for pupils and teachers
Landscaping and drainage
Window works
Redecoration, renewal and repairs
Office strip out and new AC
Asphalt repairs
Roof works
New playground fencing, equipment and planting
Our 9-week School Refurbishment Project created new indoor and outdoor space for pupils and teachers
Landscaping and drainage
Window works
Redecoration, renewal and repairs
Office strip out and new AC
Asphalt repairs
Roof works
New playground fencing, equipment and planting
Our School Refurbishment Project took just nine weeks to complete. Internally we redecorated as well as levelling the floor and introducing new blinds, cubicles, coat hooks and a small low level kitchen area. In the server room we installed a new air conditioning unit.
To the outdoor space on the roof we painted perimeter walls and jetwashed through all roof outlets to clear blockages.
In the playgrounds we repaired and repainted the playground boat and installed bright and colourful new rhino pencil fencing after clearing and disposing of much of the play equipment old equipment.
The installation of rubber mulch floor and artificial grass keeps the children safe as they play and enjoy our newly-created planting areas, whilst the playground trees are protected with our new resin surround to ensure their healthy and continued growth.
Find more Public Sector works here.
Our School Refurbishment Project took just nine weeks to complete. Internally we redecorated as well as levelling the floor and introducing new blinds, cubicles, coat hooks and a small low level kitchen area. In the server room we installed a new air conditioning unit.
To the outdoor space on the roof we painted perimeter walls and jetwashed through all roof outlets to clear blockages.
In the playgrounds we repaired and repainted the playground boat and installed bright and colourful new rhino pencil fencing after clearing and disposing of much of the play equipment old equipment.
The installation of rubber mulch floor and artificial grass keeps the children safe as they play and enjoy our newly-created planting areas, whilst the playground trees are protected with our new resin surround to ensure their healthy and continued growth.
Find more Public Sector works here.