Kent and Medway NHS and Social Care Partnership Trust (KMPT)
Client Name
Public
Sector
Kent
Location
Refurbishment
Category

Axis won an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent.

Home>Projects>Public Sector Projects>NHS Repairs and Refurbishment
  • Full Strip Out

  • New Access Control Security

  • New Kitchens

  • New Bathrooms/Showers/WCs

  • New Security Doors

  • FRA works

  • M&E Installations

  • New DDA access ramps

  • Landscaping

  • Plastering and Painting and Decorating

Get In Touch

Axis won an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent

Home>Projects>Public Sector Projects>NHS Repairs and Refurbishment
  • Full Strip Out

  • New Access Control Security

  • New Kitchens

  • New Bathrooms/Showers/WCs

  • New Security Doors

  • FRA works

  • M&E Installations

  • New DDA access ramps

  • Landscaping

  • Plastering and Painting and Decorating

GET IN TOUCH

Project Details

Kent and Medway NHS and Social Care Partnership Trust (KMPT) awarded Axis an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent. Fern Ward is an 18-bed inpatient unit caring for women.

Our new 26-week NHS refurbishment and repairs contract started in August 2022, completed in March 2023, and is valued at £1m.

Mindful of the vulnerability of the occupants of Fern Ward we phased our works, respecting the patients’ needs including their protected mealtimes, activities and learning sessions whilst ensuring all our works, site team, products and methods were in accordance with NHS guidelines and Infection Control measures.

Our full scope of works:

Showers and Bathrooms and WCs

  • Strip Out existing sanitaryware, controls, IPS units, flooring
  • Level flooring
  • Supply and install new solid surface shower trays, showerheads, temperature blending valves
  • Supply and install Trovex Hygipod Anti-Ligature IPS system, shower heads with automatic controls
  • New Anti-Ligature Security Doors
  • Supply and install Altro White rock Hygienic PVCu  wall cladding system at full height
  • Install new nonslip vinyl sheet safety flooring
  • Decorate ceilings with Dulux Mould Resisting Diamond Eggshell in white
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork

Doors

  • Remove existing doors and frames
  • Supply and install Anti-Ligature security door sets

Kitchen and Kitchenette (Tea Point)

  • Strip out existing flooring, floor and wall-mounted kitchen cupboard units, worktops, sinks etc…
  • Supply and fit new bespoke wall and floor mounted kitchen units/cupboards and worktops etc…
  • Install new nonslip vinyl sheet safety flooring
  • Install PVCu cladding to half height to walls where kitchen units do not cover

Day Room and Activity Rooms

  • Strip out skirtings and flooring
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork
  • Remove and dispose from site existing sliding partition
  • Construct new internal partition wall including decorations
  • Alter Power and Data to suit new rooms
  • Install vinyl sheet safety flooring and rubber skirtings to newly created separate rooms

Exterior

  • Clear garden area including tree removal and old paved areas
  • Remove all garden items, plants, prior to works and set aside for reinstatement on completion
  • Level off existing ground, supply crushed granite stone – thoroughly compact and leave level
  • Supply and fit artificial grass to entire courtyard area
  • Drainage Repairs include descaling and repairing defects.
  • Construct  external Patio terrace and DDA compliant access ramp

FRA works

  • Installation of Intumescent foam-Intumescent / fire resistant silicone/ gap sealers -Intumescent Collars, Wraps & Bandages-Block & Plug Systems-Fire Stop sleeves  and Fire Stop Cushions

More here

See our NHS works brochure here.

There’s more about our works for Swan’s NHS key worker accommodation here.

And see our works at Birmingham Children’s Hospital here.

Project Details

Kent and Medway NHS and Social Care Partnership Trust (KMPT) awarded Axis an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent. Fern Ward is an 18-bed inpatient unit caring for women.

Our new 26-week NHS refurbishment and repairs contract started in August 2022, completed in March 2023, and is valued at £1m.

Mindful of the vulnerability of the occupants of Fern Ward we phased our works, respecting the patients’ needs including their protected mealtimes, activities and learning sessions whilst ensuring all our works, site team, products and methods were in accordance with NHS guidelines and Infection Control measures.

Our full scope of works:

Showers and Bathrooms and WCs

  • Strip Out existing sanitaryware, controls, IPS units, flooring
  • Level flooring
  • Supply and install new solid surface shower trays, showerheads, temperature blending valves
  • Supply and install Trovex Hygipod Anti-Ligature IPS system, shower heads with automatic controls
  • New Anti-Ligature Security Doors
  • Supply and install Altro White rock Hygienic PVCu  wall cladding system at full height
  • Install new nonslip vinyl sheet safety flooring
  • Decorate ceilings with Dulux Mould Resisting Diamond Eggshell in white
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork

Doors

  • Remove existing doors and frames
  • Supply and install Anti-Ligature security door sets

Kitchen and Kitchenette (Tea Point)

  • Strip out existing flooring, floor and wall-mounted kitchen cupboard units, worktops, sinks etc…
  • Supply and fit new bespoke wall and floor mounted kitchen units/cupboards and worktops etc…
  • Install new nonslip vinyl sheet safety flooring
  • Install PVCu cladding to half height to walls where kitchen units do not cover

Day Room and Activity Rooms

  • Strip out skirtings and flooring
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork
  • Remove and dispose from site existing sliding partition
  • Construct new internal partition wall including decorations
  • Alter Power and Data to suit new rooms
  • Install vinyl sheet safety flooring and rubber skirtings to newly created separate rooms

Exterior

  • Clear garden area including tree removal and old paved areas
  • Remove all garden items, plants, prior to works and set aside for reinstatement on completion
  • Level off existing ground, supply crushed granite stone – thoroughly compact and leave level
  • Supply and fit artificial grass to entire courtyard area
  • Drainage Repairs include descaling and repairing defects.
  • Construct  external Patio terrace and DDA compliant access ramp

FRA works

  • Installation of Intumescent foam-Intumescent / fire resistant silicone/ gap sealers -Intumescent Collars, Wraps & Bandages-Block & Plug Systems-Fire Stop sleeves  and Fire Stop Cushions

More here

See our NHS works brochure here.

There’s more about our works for Swan’s NHS key worker accommodation here.

And see our works at Birmingham Children’s Hospital here.

Read The Full Case Study

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

More info

Other Property Sector Case Studies

Commercial
Social Housing
Public Sector
Heritage

About the Author: Sarah Hodgson