Follow Us

 

Care home refurbishment

Sector

Healthcare

Location

North West

Service

Planned Maintenance

We conducted bathroom replacements at Pennystone Court whilst the property remained occupied so our management team worked closely with the managers and staff to ensure disruption was minimised and that each residents’ individual needs were met. As MHA maintains a uniform appearance across their properties, our team worked with the designer employed by MHA to ensure the works met the specifications and all contract issue drawings.

What we did

Bathroom replacements in branded corporate style ensured safety and convenience of 36 vulnerable residents.

Specifications

  • Full rewiring
  • Full re-piping
  • Bathroom replacement

Project Overview

Number of months

6

Contract Value

£

1.9

M

Number of residents

36

Special accommodations and measures were implemented to facilitate working in a live care home environment. Banksmen were used to man corridors and site-specific hoardings were erected to ensure safe access to the work area while still restricting access to vulnerable residents. On-site health and safety were managed with the support of our Group Health, Safety and Environment Team and all operatives were provided with relevant training.

innovations, challenges, solutions

As the residents had varying needs, our operatives worked closely with the team on-site from the outset.

Have a project to discuss?

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

Read the full case study

MHA

You may also be interested in...

newly installed kitchen in remodelled kitchen showing upper and lower cupboards, oven and washing machine

Peabody – Landor Road Assisted Living Remodel

Axis delivered the full refurbishment and remodelling on Landor Road, to a Victorian terraced property in South London, transforming the...

Fieldway

Wigan Council – High-Rise Fire Safety Retrofit

Fieldway delivered a multi-disciplinary fire safety retrofit programme across seven high-rise blocks, improving safety and compliance for more than 700...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Fire Protection Upgrade – Union Central Building, Hoxton, London

Axis completed the Fire Protection Upgrade at Union Central Building in Hoxton, London, for William Martin Property Consultants Ltd, improving...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.