Kent and Medway NHS and Social Care Partnership Trust (KMPT) awarded Axis an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent. Fern Ward is an 18-bed inpatient unit caring for women.

Kent and Medway NHS and Social Care Partnership Trust (KMPT)

Axis won an NHS contract to refurbish Fern Ward, a high dependency psychiatric facility at St Martin’s Hospital in Canterbury, Kent.

Project Details

Our new 26-week NHS refurbishment and repairs contract started in August 2022, completed in March 2023, and is valued at £1m.

Mindful of the vulnerability of the occupants of Fern Ward we phased our works, respecting the patients’ needs including their protected mealtimes, activities and learning sessions whilst ensuring all our works, site team, products and methods were in accordance with NHS guidelines and Infection Control measures.

Showers and Bathrooms and WCs

  • Strip Out existing sanitaryware, controls, IPS units, flooring
  • Level flooring
  • Supply and install new solid surface shower trays, showerheads, temperature blending valves
  • Supply and install Trovex Hygipod Anti-Ligature IPS system, shower heads with automatic controls
  • New Anti-Ligature Security Doors
  • Supply and install Altro White rock Hygienic PVCu wall cladding system at full height
  • Install new nonslip vinyl sheet safety flooring
  • Decorate ceilings with Dulux Mould Resisting Diamond Eggshell in white
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork

Doors

  • Remove existing doors and frames
  • Supply and install Anti-Ligature security door sets

Kitchen and Kitchenette (Tea Point)

  • Strip out existing flooring, floor and wall-mounted kitchen cupboard units, worktops, sinks etc…
  • Supply and fit new bespoke wall and floor mounted kitchen units/cupboards and worktops etc…
  • Install new nonslip vinyl sheet safety flooring
  • Install PVCu cladding to half height to walls where kitchen units do not cover

Day Room and Activity Rooms

  • Strip out skirtings and flooring
  • Plaster repairs and redecorating to all ceilings, walls, and timberwork
  • Remove and dispose from site existing sliding partition
  • Construct new internal partition wall including decorations
  • Alter Power and Data to suit new rooms
  • Install vinyl sheet safety flooring and rubber skirtings to newly created separate rooms

Exterior

  • Clear garden area including tree removal and old paved areas
  • Remove all garden items, plants, prior to works and set aside for reinstatement on completion
  • Level off existing ground, supply crushed granite stone – thoroughly compact and leave level
  • Supply and fit artificial grass to entire courtyard area
  • Drainage Repairs include descaling and repairing defects.
  • Construct external Patio terrace and DDA compliant access ramp

FRA works

  • Installation of Intumescent foam-Intumescent / fire resistant silicone/ gap sealers -Intumescent Collars, Wraps & Bandages-Block & Plug Systems-Fire Stop sleeves and Fire Stop Cushions

Specifications

  • Full Strip Out
  • New Access Control Security
  • New Kitchens
  • New Bathrooms/Showers/WCs
  • New Security Doors
  • FRA works
  • M&E Installations
  • New DDA access ramps
  • Landscaping
  • Plastering and Painting and Decorating

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q