Our School Refurbishment Project took just nine weeks to complete. Internally we redecorated as well as levelling the floor and introducing new blinds, cubicles, coat hooks and a small low level kitchen area. In the server room we installed a new air conditioning unit.
To the outdoor space on the roof we painted perimeter walls and jetwashed through all roof outlets to clear blockages.
In the playgrounds we repaired and repainted the playground boat and installed bright and colourful new rhino pencil fencing after clearing and disposing of much of the play equipment old equipment.
The installation of rubber mulch floor and artificial grass keeps the children safe as they play and enjoy our newly-created planting areas, whilst the playground trees are protected with our new resin surround to ensure their healthy and continued growth.