Home | Case study | Lewisham Park Towers – Major Investment Programme

Lewisham Park Towers: Major Investment Programme

External Wall Insulation Roof Replacements UPVC Fire Safety Kitchen & Bathrooms M&E

We are improving 204 occupied flats to create healthier, more efficient homes for 240 residents. This flagship project demonstrates how large-scale retrofit works can achieve significant energy efficiency improvements while maintaining exceptional resident satisfaction. The project forms part of L&Qs broader £3 billion, 15-year Major Works Investment Programme and is part-funded by the Social Housing Decarbonisation Fund, reflecting its focus on sustainability and the pathway to Net Zero 2050.

What we did

Axis delivered a comprehensive £20 million Major Investment Programme across three 17- storey tower blocks for L&Q Housing Association

Project Objectives

The goal was to boost energy efficiency and thermal performance of the buildings, reducing energy consumption, lowering carbon emissions, reducing energy bills for residents, and helping tackle fuel poverty.

Additionally, the works improved safety, comfort, and overall living conditions through essential fire safety works, structural repairs, and providing warmer homes.

Technical Specifications

  • 12,000m² of External Wall Insulation (EWI)

  • Acrylic brick slips specially manufactured to match original brickwork and comply with conservation requirements

  • Roof replacements using innovative Eco FF insulation (80% biomass-based - first installation in London)

  • 900 new powder-coated aluminium energy-efficient windows replacing existing UPVC units

  • Structural repairs to façade and concrete panels

  • Fire-proofing works to flats and vertical services ducts

  • Main sprinkler and fire alarm system installation

  • Kitchen and bathroom refurbishments

  • Extended boiler flues replacement

  • New continuously running extraction fans with extended ducting

  • External soil vent pipes for improved maintenance access

  • CCU units and boiler replacements where necessary

Solutions Delivered

The programme combined technical solutions with resident engagement. Technical solutions include external wall insulation chosen for excellent thermal performance, durability, and A1 fire safety rating. All 900 windows were replaced within 10 weeks. Building services upgrades include structural repairs, extractor fan upgrades, boiler flue extensions, and new external Soil Vent Pipes.

Community solutions were equally comprehensive. The Residents Hub provided respite from works, offering quiet office spaces with free Wi-Fi and hosting community activities in partnership with local charities. A multi-channel communication strategy included a bespoke project website and app, newsletters, bi-monthly meetings, and real-time updates, with translation services supporting the diverse community. Site-based Resident Liaison Officers ensured resident needs were considered throughout delivery.

Energy Performance & Environmental Impact

The project delivered substantial energy efficiency improvements. Energy bill reductions of more than 50% for residents, with many already reporting reduced heating needs and improved comfort. The EWI system provides substantial carbon savings and improves thermal efficiency to a U-Value of 0.26. The innovative roof insulation, manufactured from 80% biomass-based materials, demonstrates commitment to sustainable construction practices.

Energy bill reductions of more than 50% for residents

Wall thermal performance improved to U-Value of 0.26

Substantial carbon emissions reduction contributing to Net Zero targets

First London installation of sustainable Eco FF insulation

Enhanced thermal comfort and reduced heating requirements

Significant fuel poverty reduction across affected households

Project Delivery Excellence

Works were programmed simultaneously across three blocks with capped live flats to ensure quality and resident care. The coordinated approach included scaffold erection, window renewals, M&E works, structural repairs, roof replacements, EWI application, scaffold strike, and ground works completion.

Delivery Performance

100% on-time delivery

100% within budget

High installation standards confirmed by external inspections

Three tower roofs completed

All 900 windows replaced within 10 weeks

Project timeline

STEP 1

Installation of External Wall Insulation

STEP 2

Window renewals

STEP 3

M&E works - new boilers and ventilation system install

STEP 4

Roof replacements

Outcomes & Impact

The project delivered significant outcomes in building performance, resident satisfaction, and project management.

Comprehensive renovations improved safety and living conditions. Beyond physical improvements, the project fostered community spirit through The Residents Hub and activities. Environmental sustainability is demonstrated through innovative materials and energy efficiency improvements.

92% resident satisfaction score

EPC rating improved from D66 to B85 (19 SAP point improvement)

74.19% reduction in space heating demand

49.37% reduction in estimated fuel use

30.62% reduction in fuel costs (£199 annual saving per household)

52.38% reduction in carbon emissions (1.1 tonnes CO2 per flat annually)

Enhanced fire safety and building structural integrity

Strengthened community spirit and resident trust

100% on-time and in-budget project delivery

External validation of high installation standards

Resident Satisfaction & Community Engagement

The project achieved a 92% resident satisfaction score, with the engagement strategy praised by Tpas, the UK’s leading tenant engagement experts. Three full-time, site-based Resident Liaison Officers provided personalised support, while The Residents Hub served as both quiet workspace and community activity venue. Digital innovation through a bespoke website and app with live updates streamlined communication.

Community Investment

Restored Lewisham War Memorial Garden railings at no cost

Transformed bedbound resident's overgrown garden

Hosted Community Recycle Day collecting 1,640kg of waste

Funded L&Q resident's medical studies abroad

Plans to renovate tower buildings' old community room

Axis is like a family; they treat us more than just residents

Resident

It’s much better insulated now… cosy now

Resident

Communication from everyone has been fantastic and the windows look lovely

Resident

Absolutely awesome service – very punctual, respectful, considerate and efficient

Resident

Project Legacy

Plans include renovating the towers' old community room and involving residents and an architect in designing new outside spaces, ensuring lasting positive community engagement beyond construction completion.

The project provides a replicable model for majorn investment programmes across the social housing sector, demonstrating that large-scale retrofit can be delivered with exceptional technical performance, resident satisfaction, and community benefit.

Have any questions?

For more information about Axis’ Major Investment Programme capabilities, contact Joe Hayes.

Contact Us

Joe Hayes

Partnerships Director

joseph.hayes@axisclc.com

You may also be interested in...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn