Flat Refurbishment

Sector

Social Housing

Location

London

Service

Refurbishment

Axis successfully carried out a flat refurbishment project for The Hyde Group, transforming 5 flats, with a high-quality finish.

The Hyde Group

Axis successfully carried out a that transformed a mixture of properties into 5 flats, with a high-quality finish

Project Details

Axis successfully carried out a full programme of flat refurbishments within this refurbishment and conversion project for The Hyde Group. Works were delivered to a mixture of properties, including bedsits and flats. Our team transformed the buildings into 5 flats, all completed to a high-quality finish. Our Client The Hyde Group is a prominent housing association based in London and is part of the G15 group.  

Axis’ housing division completed a full strip-out of the apartments. We began with demolition works, which were carried out throughout, to a shell and core base. This included structural alterations and renewals. The team remodelled the properties under a new design and moved on to a programme of internal and external refurbishments.  

We provided a structural re-build of ground floor extensions to create new living space. Our team also covered fit-outs for both kitchens and bathrooms, which included new floors and ceilings. Within each kitchen, we installed the necessary appliances. We also fitted all of the internal windows and doors. The team then went on to improve the communal entranceways, stairs, and landings.

We completed a schedule of exterior jobs which included the refurbishment of facias, soffits and bargeboards. The team implemented security and access control across the building, which was completed by our Mechanical and Electrical division. We also completed the refurbishment of each flats’ rear extension. Our team finalised the works with a full roof refurbishment, which included coverings and replacement. 

Our team then took on a programme of ancillary works within the flat refurbishment. We provided new drainage alterations, in line with our work on the toilets and showers. We also installed new water meters for the properties. The team completed further internal works including gas installations. We also delivered some ancillary external jobs, with the construction of fencing. The project was completed with landscaping work. 

Specifications

  • Full strip-out
  • Gas installations
  • Facias, soffits and bargeboards
  • Kitchens and bathrooms
  • Drainage and Plumbing
  • Security and access control

Axis’ housing division completed a full strip-out of the apartments to a high-quality finish

Planned repairs services

rnLooking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks