Follow Us

 
Close-up of a qualified electrician's hands performing safety checks and wiring on a domestic consumer unit for housing compliance services.
Home | Case study | Housing Compliance Services

Housing Compliance Services

Sector

Social Housing

Location

Midlands

Service

Responsive Repairs

Axis has partnered with WHG (Walsall Housing Group) to provide housing compliance services across our Repairs and Maintenance contract. WHG manages 20,000 homes and is one of the largest housing associations in the West Midlands region. Our contract is worth a value of £1m per year.

Walsall Housing Group

Axis has provided housing compliance services across our Repairs and Maintenance contract with WHG

Project Details

The compliance works span 130 communal blocks and 72 void properties per year. They include Fire Risk Assessments (FRAs) – for 1,500 fire doors and fire-stopping in roof spaces. We also provided asbestos testing and removal. This comes alongside smoke alarm and carbon monoxide alarm testing and replacement, as well as gas safety testing.

Running compliance throughout all the works helps our client in many ways. Our contract managers oversee the work while a dedicated contract administrator ensures the compliances are recorded in line with the wider programme management. We send weekly records and bi-weekly full contractor updates to WHG.

WHG has full supervision and control while maintaining full visibility of the status of each compliance service. We help make considerable savings for WHG, as one example shows that in the first year our client saved around 36% on the cost of fire door replacements. This amounts to approximately £240,000.

Our direct operatives reduce overlap and increase productivity elsewhere on the contract, creating efficiency throughout. For example, Axis Resident Liaison Officers (RLOs) increased our access to residents’ homes.

Project feedback

We have vastly increased the installation rate of fire doors, fire rated closers and frames. Before Axis took on the WHG contract it was 61%, which has risen to 99%. Another notable benefit of our integrated housing compliance services management approach is increased resident satisfaction levels which now stand at 98%. Residents establish relationships with Axis operatives and RLOs and get quick results. We fix prospective compliance failings in real-time and join them up with repairs and maintenance services.

Ammo Singh, Commercial Manager at WHG, said “The integrated management approach adopted by Axis has really paid dividends for us. Full transparency over works has demonstrated value for money savings and provided peace of mind that we are on top of our compliance. But, crucially for us, we have been able to deliver better services to our residents.”

Specifications

  • Fire Risk Assessments
  • Fire doors and fire-stopping works
  • Asbestos testing and removal
  • Smoke alarm testing and replacement
  • Carbon monoxide alarm testing and replacement
  • Gas safety testing

The integrated management approach adopted by Axis has really paid dividends for us… We have been able to deliver better services to our residents

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers: Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge