Project Details
Our public sector team took on this contract and began with a programme of flooring replacement works. We installed each kitchen unit and scribe finished all of the worktops. The team also applied various mechanical and electrical elements in the project, which included a full kitchen rewire. Alongside this, we made electrical outlet upgrades and delivered plumbing works for the piping and sink within the kitchens.
The team then installed all of the specified kitchen appliances. We fitted each unit with a built-in double oven as well as an inset hob, and cooker extraction unit. We also ensured the completion of internal redecorations. Each renewal within this kitchen refurbishment project was completed in 8 working days to the specification of the client.