Home | Case study | Re-modelling and refurbishment of office space

Re-modelling and refurbishment of office space

Sector

Heritage

Location

London

Service

Refurbishment

To provide new office facilities for the Inns of Court College of Advocacy, The Honourable Society of Gray’s Inn contracted Axis to conduct a complete reorganisation and refurbishment at basement, ground, first and second floor levels at their premises at 14 South Square.

The Honourable Society of Gray’s Inn

6-month extensive remodelling and refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn.

Project Details

Following a full strip out, we reconfigured the ground floor space to provide a new reception area, a DDA-compliant WC, a teapoint and two meeting rooms with a moveable partition wall between.

Our reconfiguration of the first floor provided an open plan office area, enclosed photocopier area, a private office, a teapoint and two unisex WC compartments.

And on the second floor we remodelled the space to create an open plan office area, unisex WCs plus shower, a private office and a small meeting room.

Creating a new DDA-compliant access from vehicular archway included adjustment to existing paving/roadway levels.

We installed mechanical ventilation to whole of ground floor and first/second floor lavatories and kitchen.

We stripped out all heating pipework back to risers and ran new copper heating pipework to serve the radiators and additionally stripped out and renewed all wired services.

And we finished up with fire compartmentation works and a spring clean of the basement.

Our precise scheduling of works minimised disruption, particularly around noise, to the tenants and their neighbours and satisfied our client’s requirements.

Benefits

  • Modernisation
  • Flexible space
  • Enhanced tenant satisfaction
  • DDA-compliant accessibility
  • Practical work environment
  • Continued use of historic building

Client relationship

Gray’s Inn is one of the Inns of Court in London – the historic societies that educate and train barristers in England and Wales. For this longstanding client, Axis’ Heritage Team has previously completed extensive refurbishment and modernisation projects including:

  • Modernisation project to the ground floor at South Square
  • High-end refurbishment of a residential penthouse apartment suite
  • Void reinstatement works
  • Refurbishment project at Grade II listed The Dolls House
  • Conversion of IT hub at Griffin Lodge

Specifications

  • Heritage building
  • Strip out
  • Space reconfiguration and remodelling
  • Office fit out
  • Movable partition walls
  • New entrance/reception area
  • New offices and conference rooms
  • DDA-compliant access
  • DDA-compliant WC
  • Shower room
  • New teapoints
  • Plumbing
  • Ventilation
  • M&E
  • Flooring
  • Refurbishment & Demolition (R&D) surveys
  • Asbestos removal

The tenant is really overjoyed at what we’ve achieved …

Our working relationship with the site manager for this project was excellent. He [Axis’ Taylor Farrell] rang me at eight o’clock every morning to check I was happy and to just discuss any issues going forward.

And really that carried on throughout the job. The very close working relationship meant that some potential problems were identified before they became an issue and solutions discovered and adopted. Through this collaboration, we were able to address any issues immediately, which meant that there were no delays to the project, and we achieved the standard we required.

As with most projects, there was design development as the job progressed and Axis were very amenable to working with us to improve and enhance the design as we moved forward.

Richard Young, Director

GHK Architects

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

MHS – Roof Repairs and Maintenance Works

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent