Follow Us

 
The modern plant room of a new commercial Air Source Heat Pump (ASHP) system, featuring large blue buffer tanks, pumps, filters, and expertly installed insulated pipework.
Home | Case study | Replacement Heating System – ASHPs

Replacement Heating System – ASHPs

Sector

Social Housing

Location

London

Service

Decarbonisation

Axis’ M&E Division was contracted to replace the central gas boiler plant with a new air source heat pump system (ASHP) at Fountain Court, Royal Borough of Kingston’s (RBK) housing-with-care property.

Royal Borough of Kingston

We upgraded a residential property in Kingston with energy-efficient heat pumps, solar panels, and a new LTHW system.

Project Details

Axis’ M&E Division was contracted to replace the central gas boiler plant with a new air source heat pump system (ASHP) at Fountain Court, Royal Borough of Kingston’s (RBK) housing-with-care property.

This is a fully-occupied, two-storey residential building which includes 29 flats, kitchen and bathroom/shower rooms, a communal lounge area, and two laundry rooms.

Three new 41kw Bosch Air Source Heat Pumps were installed to supply heat through the plant room to HIUs in 29 flats and 5 HIUs in communal areas. Two are working full time, one is for back up. We installed them at the rear of the communal garden in a brick-built acoustic enclosure especially designed to reduce noise pollution for residents and neighbours, and ensure compliance.

In addition to the new ASHPs we installed new Heat Interface Units (HIUs) within each apartment and a new Low Temperature Hot Water (LTHW) system throughout.

We completely stripped the plant room of the existing boilers (which were approaching end of life) and their associated controls. We removed all the existing radiators in the flats and communal areas. New distribution pipework was installed to run from the roof space into each apartment, the communal areas and the plantroom.

Two new 800l buffer vessels store hot water for the HIUs. And a new cold water booster system ensures good water flow for residents, while new pressure units keep the pressure system topped up at all times.

Additional works included the installation of a new Building Management System (BMS) which we can access remotely to maintain, new emergency lighting and new fire alarm devices to the plant room.

We also added solar panels which generate enough electricity for the communal areas, immersion heaters as well as feeding buffer vessels.

Since installation (in November 2024) the solar PV system has generated 1.2MW of energy which is approximately 20% more than anticipated for this time of year. During daylight periods the PV is providing 76% of the required energy for the property. Where there is surplus energy the battery is being used on average 5.6%.

PV installation report, February 2025

Benefits

  • Solar panels provide 76% of required energy
  • Energy-efficient heating and hot water
  • Reduced energy costs
  • Helps client with Net Zero targets
  • Reduced carbon emissions
  • Fully electric property (no gas)
  • Enhanced safety
  • More control for residents
  • Consistent hot water supply
  • Improved pressure in water supply
  • Reduced service charges

Residential Care

Throughout the works we took great care to keep our residents – some are elderly and vulnerable – well informed of our progress through frequent newsletters and via our manned on-site office.

We installed a temporary gas boiler so residents had heating and hot water for the whole duration of the works and we also distributed temporary heaters.

We kept our site tidy – where redundant materials could not be removed daily, we provided a lockable skip. These measures ensured we did not restrict access or free movement for residents to the various buildings, while barriers and signage kept them safe from our working areas too.

The site also featured Heras fencing with a lockable gate to provide extra security and peace of mind for residents.

At Christmas we invited everyone at Fountain Court to share a Fish and Chip supper with us to celebrate the festive season – and their improved heating and hot water system!

Our Client

Axis has conducted planned and responsive repairs programmes for RBK since 2013. Most recent similar projects include an air source heat pump installation at Four Oaks and a communal boiler replacement at Charles Lesser House.

Shortlisted for Award

We’re delighted that we are finalists at 2025 HVR Awards for this project with Worcester Bosch in the Collaboration of the Year category.

Specifications

  • Strip out
  • Solar PV panels
  • 3 41kw Bosch Air Source Heat Pumps
  • 34 Heat Interface Units (HIUs)
  • Low Temperature Hot Water (LTHW) system
  • 2 800l buffer vessels
  • Acoustic enclosure
  • Cold water booster system
  • Distribution pipework
  • Pressure units
  • Remote access BMS

I am very impressed by what I have seen today. This is the kind of programme we can run across the whole of Kingston. It’s very efficient. It means it’s all electrical and we don’t have to have any gas here.

Councillor Ian Manders, Portfolio Holder for Climate Action

Biodiversity and Planning Policy, RBK

They’ve done a lovely job, very professional. We are very happy. It’s much warmer. It’s good for the people of Kingston. It should be put out more

Resident

Working with Axis has been extremely beneficial to some of the residents here. Axis have been accommodating to their vulnerabilities… and we’ve had some really good comments and praise from the staff here.

This has been a very successful arrangement, and we are looking to build on this relationship with Axis.

Paul Dunkerton

Lead Officer, Assets and Compliance, RBK

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.