Follow Us

 
Home | Case study | Union Central Buildin: Fire Protection Upgrade & New Sprinkler System

Fire Protection Upgrade

Sector

Social Housing

Location

London

Service

Fire Safety

Axis upgraded the fire protection system and installed a new wet sprinkler system to the residential atria at Union Central Building for William Martin Property Consultants Ltd. Delivered between September 2025 and February 2026, the £280,000 programme improved active and passive fire safety within a fully occupied building. Works included dry risers serving both stair cores, extensive fire stopping and compartmentation upgrades, fire door replacements, passive fire protection and atria repairs. Specialist access solutions supported works within the building’s curved atrium.

What we did

Fire protection upgrade improves active and passive fire safety at Union Central Building in East London for William Martin Property Consultants Ltd.

Specifications

  • Wet sprinkler system
  • Dry riser installation
  • Fire stopping upgrades
  • Compartmentation upgrades
  • Fire door replacements
  • Passive fire protection
  • Ceiling protection
  • Riser protection
  • Communal area protection
  • Atria repairs
  • Specialist atrium access

Contract value

£

280

k

Duration of project

6

months

Stair cores served by dry risers

2

Axis worked closely with the Resident Liaison Manager throughout the works, maintaining resident safety and access while minimising disruption.

Resident Care and Communication

Careful coordination and regular communication supported safe delivery within the fully occupied building.

Specialist scaffolding and mobile access solutions enabled safe installation of sprinkler pipework and infrastructure within the curved atrium. Additional fire stopping requirements identified as concealed areas became exposed were incorporated efficiently into the programme.

Challenges

The curved atrium and fully occupied environment required specialist access, phased planning and careful coordination.

Benefits

  • Improved fire safety and compliance
  • Active fire suppression sprinkler system
  • Reduced potential for fire spread
  • Reduced potential for smoke damage
  • Improved compartmentation
  • Better protection of escape routes
  • Improved passive fire protection
  • New dry riser infrastructure
  • Improved protection across communal areas

Read the full case study here

Have a project to discuss?

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Union Central Buildin: Fire Protection Upgrade & New Sprinkler System

Axis delivered a £280,000 fire protection upgrade at Union Central Building in East London for William Martin Property Consultants Ltd,...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.