Follow Us

 
An Axis-branded 'Zero Emissions Electric Vehicle' van is parked and plugged into a wall-mounted Mer charging station, showcasing a commercial EV fleet installation.
Home | Case study | Axis Electric Vehicle Charging Point Installation

Axis Electric Vehicle Charging Point Installation

Location

London

Service

Planned Maintenance

Learn more about the electric vehicle charging point installation that took place in the London Stratford Head Office.

Axis Europe

Axis has installed an electric vehicle charging point network at our London Stratford Head Office.

Project Details

To prioritise sustainability (learn about our approach) at Axis Europe, we’ve taken proactive steps by establishing an electric vehicle (EV) charge point network at our London Stratford Head Office. Collaborating with MER, we’ve installed EV charger points to facilitate convenient charging for our team and visitors.

Site Assessment

Through a site assessment, we gauged the electrical load from existing infrastructure and pinpointed optimal locations without our car point for charge points. Leveraging this assessment, MER recommended suitable locations and equipment to meet our requirements.

Charger Section

After assessing the site, we opted for 5 x Eve Double Pro Line 22Kw charge points, each equipped with a double outlet capable of delivering 22Kw of charging capacity. These charge points offer remote monitoring and real-time usage data, facilitating efficient management.

Installation

Following the site assessment and charger selection, our contractors installed the external LV distribution system at the designated charge point locations. MER installed 1 x Eve Double Pro Line 22Kw charge point unit, enabling charging for EVs using the designated bays. Our infrastructure as the potential to accommodate an additional 4 charge point units from MER or other EV charge point manufacturers in the future. The installation process adhered to EV safety regulations and involved coordination with local utilities for seamless execution.

Ongoing Maintenance and Support

MER provides ongoing maintenance and support, ensuring optimal performance of the EV infrastructure and charge points. This includes regular check ups, firmware updates, and prompt response to any issues raised.

Benefits of EV Charging

Cost Savings: EVs generally incur lower fuel and maintenance costs compared to traditional vehicles.

Environmental Benefits: EV adoption reduces carbon emissions, promoting a cleaner environment.

Employee Benefits: Providing EV charging points demonstrates our commitment to sustainability, enhancing employee morale and satisfaction.

Conclusion

The successful installation of EV chargers at our London Stratford Head Office reflects our dedication to sustainability and cost efficiency. By investing in EV charging infrastructure, we’re advancing towards a greener future. Learn more about our EV charging solutions, including our project with the Metropolitan Police Service.

Specifications

  • Charging points
  • High level containment
  • New external LV distribution system
  • Double outlet 22Kw charging point
  • Signage
  • Back office maintenance and support

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...