Grade II residential building upgrade

Sector

Social Housing

Location

London

Service

Refurbishment

Axis delivered an extensive historic residential building upgrade at Thames Tunnel Mills, a Grade II listed mid 19th century former mill building and warehouse on the River Thames: one of the earliest residential conversions in Docklands.

L&Q

In 16 months, Axis delivered an extensive £1.75m Grade II residential building upgrade at Thames Tunnel Mills for L&Q.

Project Details

Our client’s objective was to upgrade the energy efficiency of Thames Tunnel Mills, one of the older buildings within L&Q’s portfolio, whilst preserving its historic elements.

Following retrofit assessments, our team delivered roof renewals with insulation, renovated all the doors and windows (including the porthole Crittall windows) through timber repairs, and overhauled the existing ventilation system.

Internally, we provided decorations to the communal rooms and conducted remedial damp works, while our external works included decorations, timber repairs to the jetty, and repointing and brick and masonry repairs including to the furnace tower. We also renewed the glass atrium and renovated the roof-top garden.

Thank you to our external suppliers and consultants who assisted us on this refurbishment project: UAS, Jack Arnold, Elite Abseiling, Jaw Roofing, and Amac.

The result is a Grade II listed building that meets our client’s specifications providing convenient modern accommodation that pleases the residents:Testimonials

Specialist works

Because Thames Tunnel Mills is built on the banks of the river Thames, we designed and built unique scaffolding using standards which float from the building rather being built within the water.

We liaised with the Port of London Authority, building the scaffolding at low tide, installing gallows brackets as we built upwards, and then removing and disposing of the lower tower.

We also installed lifesaving equipment as part of our licensing agreement with the Port of London Authority.

We built a scaffold platform over the Thames so the team could abseil down to the crane and begin works.

We also had to hang the front elevation scaffold from gallows brackets: the front path is very narrow and emergency access vehicles need access 24 /7.

Benefits

  • Heritage-appropriate modernisation
  • Noise reduction
  • Enhanced energy efficiency
  • Practical modern living
  • Continued use of iconic building
  • Enhanced aesthetic appeal
  • Increased resident satisfaction
  • Futureproofing
  • Reduced running costs

Client relationship

Axis has partnered with L&Q for many years, securing in 2023 Lot A3 – South – South & South East in their £3bn 15-year Major Works Investment Programme. Previous large scale projects for L&Q include:

  • Retrofit solar panel project to three apartment blocks at Reculver Road in south east London
  • External works and roof repairs to 20 Victorian apartment blocks at Elmhurst Mansions in south west London
  • Cyclical refurbishment and roof works to 47 Victorian terraced blocks containing 147 apartments at Morat Street in south west London
  • Fire Safety upgrade to three tower blocks in Lewisham Park, south east London

Specifications

  • Grade II listed
  • Flat and pitch roof renewals
  • Installation of insulation
  • Full atrium glass replacement
  • Windows and doors refurbishment
  • Overhaul and decorations to pivot windows
  • Jetty repairs
  • Repointing
  • Crane repairs and decorations
  • Ventilation system overhaul
  • Full carpet renewal throughout the whole block
  • Installation lifesaving equipment
  • Timber repairs
  • Masonry repairs
  • Internal and external decorations

Axis has brought Thames Tunnel Mills into the 21st century. These new windows are more modern, yet in keeping with the building’s old design. Previously, the windows were decaying a bit, they didn’t close properly. Axis came along, and noise has never been better in the apartment; the temperature never been better.

Resident

The work Axis carried out in our building resulted in having a much secure, much brighter, and much cleaner place to live.

Resident

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.