Follow Us

 
A female resident in a wheelchair uses a newly installed, custom-built metal ramp to safely access the front door of her brick home.
Home | Case study | Aids and Adaptation Services for Wheelchair User Resident

Aids and Adaptation Services for Wheelchair User Resident

Sector

Social Housing

Location

London

Service

Refurbishment

Our client, L&Q, contracted us to undertake a kitchens and bathrooms replacement program across over 110 properties. For this project, we’ve focused on improving accessibility for a wheelchair user resident in a social housing property in London. This project is dedicated to enhancing both accessibility and functionality within the home.

L&Q

L&Q has contracted our team to make upgrades to a kitchen, bathroom and entryway, enhancing the accessibility and functionality of the home

Project Details

The project began with an Occupational Therapy (OT) report, along with structural and boiler assessments, gas engineering, and preliminary surveys, including door measurements and service checks to ensure full accessibility to the property.

In the bathroom, we removed the existing fixtures and demolished the wall between the bathroom and toilet to create a single, fully accessible wet room. The new bathroom features non-slip flooring, full waterproofing, and accessibility enhancements like wall-mounted grab rails and foldable shower seat. We installed a wheelchair accessible shower, wash basin, pedestal and standard-size toilet. We upgraded plumbing and electrical systems to support the new features, ensuring that all the controls were within easy reach for the wheelchair user resident.

Resident quote:

In the kitchen, we carried out significant demolition, including the removal of two larder cupboards, worktops, and kitchen units. The redesigned kitchen now includes lower countertops, pull-out shelves, and appliances with front-facing controls, all aimed at improving accessibility for the wheelchair user resident. We also fitted the kitchen with non-slip flooring to enhance safety and ease of movement.

To further improve mobility and accessibility to the property, we removed steps, door thresholds, and a large tree at the front entrance. We installed modular ramps at both the front and rear of the property, constructed from durable, non-slip materials. We resized a radiator in the hallway to facilitate easier wheelchair manoeuvring, and installed an additional plug socket to reduce trip hazards.

Throughout this extensive aids and adaptations project, conducted in an occupied home of three residents, our team maintained clear communication, with regular on-site visits to explain progress and address any concerns. These modifications to the wet room, kitchen and entryways have significantly enhanced the wheelchair user resident’s safety, comfort, and daily living environment.

Benefits

  • Enhanced home safety, comfort accessibility and functionality

Client Relationship

Our relationship with L&Q continues to thrive, we’re entering our tenth year of successful collaboration. Last year, we secured the 15-year Major Works Investment Program contract, building on our history of delivering diverse projects, including aids and adaptations services and FRA. With this strong foundation, our long-standing partnership with L&Q is set to continue well into the future.

Specifications

  • Occupational Therapy (OT) Report
  • Structural and boiler surveys
  • Disposal of old units and sanitary ware
  • Mechanical and electrical works
  • Installation from old bathroom to new wet room
  • Kitchen unit installation
  • Rear door replacement in kitchen to garden
  • Two ramp modular installations

The change in the bathroom has given me a better way of using the space because the wall has been taken down, so it’s bigger. I’m able to turn around in my wheelchair.

Resident quote

Adapting the kitchen has had a huge impact on mum. She’s able to come down, wash up, get her breakfast, do some cooking and actually just become a member of the family again, having some input into the family.

Laura Watkins, South Delivery Lead

L&Q

From an L&Q perspective, it’s great to work with a contractor like Axis that listens and delivers work to a high standard.

Laura Watkins, South Delivery Lead

L&Q

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

You may also be interested in...

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks