Exterior Cladding Project

Sector

Social Housing

Location

London

Service

Building Compliance

Axis delivered an Exterior Cladding Project to the value of £900,000 for Peabody at Bridgestone House in 12 months.

Peabody

Axis delivered an Exterior Cladding Project to the value of £900,000 for Peabody at Bridgestone House in 12 months.

Specifications

  • Surveys
  • Weatherproof membrane
  • Design and installation new Vitradual cladding
  • Scaffolding
  • Removal of existing cladding
  • Replacement of timber decking

Project Details

Peabody employed Axis to replace existing high-level cladding and private balcony decking with non-combustible materials at Bridgestone House, a six-storey block comprising 27 occupied flats on Blue Anchor Lane in Bermondsey south east London.

We conducted detailed investigation reports and surveys to scope out the design. Our Exterior Recladding Works involved removing the existing non-compliant external wall systems, balcony decking and soffits, and designing and installing a new Vitradual cladding system to current building regulations standards.

We replaced timber decking on the cantilever balconies with aluminium decking. A weatherproof membrane insulated the flats during the works. Regular design team meetings were held with client’s consultants and fire officers. Covid-19 caused shortage of materials but we, with a long-established supply chain, were in a good position to order/secure materials and reduce delays in our Exterior Recladding Works programme.

Care of our Residents

To minimise disruption to residents, we phased our work programme, beginning by replacing balcony decking whilst the cladding design procedure was in progress. The team then completed the cladding to the top penthouse apartments and removed scaffolding here before renewing cladding at the main communal entrance on Blue Anchor Lane.

All the works at Bridgestone House were carried out during the Covid-19 pandemic through which Axis followed Government Guidelines:  our employees wore appropriate PPE equipment, conducted hygiene and safety checks before entering residents’ homes, carried out regular cleaning and kept non-essential personal contact to a minimum.

Our Resident Liaison Officers kept residents fully informed about the works through personal house visits, regular poster announcements in communal areas as well as via personal email and hand-delivered newsletters and took special care with vulnerable residents. Where COVID-19 restricted our Open-Door policy in our Site Offices we provided updates via Zoom meetings and were available for Out of Hours meetings.

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

solar panels on grey asphalt roof

London Borough of Hounslow

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Millers Row, Essex

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...