The ‘Social Enterprise Hub’ scope of works included the fit-out of a new core and shell building spanning over 2 floors, as well as the installation of an adjoining commercial kitchen. The commercial kitchen installation was carried out by our Mechanical and Electrical division who added fully functioning steel-plan furnishings. This came alongside sanitary works and plumbing utilities, as well as heating and ventilation works.
Our team introduced a platform lift to make both floors of the new build accessible as well as building a new accessible WC. We added raised flooring and stud partition walls. We also constructed a new reception and coffee shop.
Our team also completed a communal seating area, with several glass-panelled meeting rooms and open-plan hot desk area. The seating can accommodate 46 people with separate offices and WC facilities. This created a workspace and a meeting point for young entrepreneurs within the local community. Some of the design elements in the new build included a timber staircase. We also added a CCTV and access system for better security of the property.