Axis was employed to complete cyclical external decoration for our long-term client, Notting Hill Genesis. Our repairs and maintenance team carried out the repairs at properties on Newton Road, within a Heritage Westminster conservation area, in London. This project has been split into two case studies, the counter-part which looks at the roof works carried out for NHG as part of the same contract can be found here.

Notting Hill Genesis

We delivered cyclical external decorations across 5-years, at a value of £3 million

Project Details

Our team began work by conducting an asbestos survey of the properties, which are a mixture of houses and flats. The team then proceeded with the external maintenance programme. We removed all failed render and re-skimmed, reforming all the original exterior details. Next, we replaced the sections of balcony railings that were missing, loose, and in some instances dangerous. This came alongside fitting renewed spindles and any missing fleurs-de-lys from the ground floor railings. The team then renewed all original timber sash windows with new double-glazed heritage units. We also restored the front doors and frames with new Victorian-style timer doors.

Some balconies were leaking, so we renewed all the asphalt to the balconies and drip edge details. In addition, we removed and renewed the asphalt steps. The team fully re-plastered and decorated all communal areas, with new carpets installed. We installed Aereco ventilation units into the flats, which are designed to manage moisture content.

Project Challenges

The main challenge we faced in this cyclical external decoration project was Notting Hill Carnival. No scaffolding can be left erected over the weekend of the celebrations, so we had to ensure the timely dismantling of the scaffolding before re-erecting it for further work. Another minor challenge to the project was inclement weather, which posed issues for painting as is usually the case in Winter. However, these are common challenges that our team expects to overcome with relative ease.

Works were spread across the boroughs of Kensington and Chelsea, Hammersmith and Fulham, and Westminster. Projects within suburban areas always bring challenges regarding residents, schools, and restricted access. However, our dedicated Resident Liaison Officers keep regular contact with residents, managing queries as well as ensuring regular client updates.

Our team produced an extremely high quality of workmanship throughout, and the cyclical external decoration programme ran on time, to budget, and to the client’s satisfaction. Our contract with Notting Hill Genesis is in its fifth and final year, and they have awarded us future projects due to the success and quality of the work completed.

Specifications

  • Asbestos survey
  • Removal and replacement of failed render
  • Renewal of spindles and missing fleurs-de-lys
  • Renewal of original timber sash windows
  • Re-plastering and decoration of communal areas
  • Installation of Aereco ventilation units

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance