Follow Us

 
Panoramic shot of a large, refurbished Art Deco style apartment building, showcasing its prominent curved white balconies against a red brick facade.
Home | Case study | Exterior Redecoration

Exterior Redecoration

Sector

Social Housing

Location

London

Service

Refurbishment

Gateway Housing Association is a community-based housing association and manages 3,000 homes across East London. The largest provider of sheltered housing in Tower Hamlets, Gateway also provides housing in the London Boroughs of Newham and Hackney.

Gateway Housing Association

We completed this £1.1m Exterior Redecoration project across 6 months.

Project Details

Axis successfully completed an Exterior redecoration contract for our new client Gateway Housing Association in six months.

We conducted our Exterior Redecoration programme across 58 properties in two blocks: 34 residential flats in Constant House on Harrow Lane and 24 residential flats at Holmesdale House on Poplar High Street. Both residential blocks are in Poplar, East London, E14.

Our Exterior Redecoration services improved windows and doors as well as the external areas of the properties, resulting in a better, functional and more attractive living space for residents.

Specifically we replaced existing windows and meshed screens to the communal areas with powder-coated aluminium double glazed windows.

We washed down both blocks, replaced the walkway and stairwell floor coverings which had failed and replaced existing flat entrance doors with fire proof door sets. We also painted the pillars.

Our Mechanical and Electrical Services provided a full refurbishment of the communal facilities, specifically: a communal kitchen, communal male toilet, DDA toilet, and complete new electrical and plumbing installations. The M & E team also upgraded external paving.

Due to both sites’ proximity to busy high streets, Axis implemented a safe system so as not to impede pedestrians and traffic, using elevated platforms (rather than scaffolding) whilst undertaking the works.

Whilst Axis’ teams were conducting the Exterior Redecoration works for Gateway, our CI team worked with our client to transform an unused communal space into a community hub for residents.

More about Gateway Housing Association

Gateway Housing Association is a community-based housing association and manages 3,000 homes across East London. The largest provider of sheltered housing in Tower Hamlets, Gateway also provides housing in the London Boroughs of Newham and Hackney.

Specifications

  • Window Works and Replacements
  • Exterior Painting
  • Mechanical and Electrical
  • New Fire Doors
  • Upgrade Staircases and Walkways
  • Communal space refurbishment

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks