Grade 2 Listed Building Repairs

Sector

Heritage

Location

London

Service

Refurbishment

Axis succesfully carried out grade 2 listed building repairs and structural work to this iconic Georgian property, The Doll’s House.

The Honourable Society of Gray’s Inn

Our specialist heritage team delivered refurbishments to this Georgian era property

Project Details

Our specialist heritage team completed all repairs in keeping with the 18th-century building’s traditional design. We selected all of the materials very carefully because of the need to protect the building’s original features from pollutants and weathering. Internal and external decorations included the repair and treatment of metalwork. This came alongside rendered surfaces and concrete sills, and the restoration of wooden doors and sash windows, prior to full redecoration of all previously coated surfaces.

External works within the listed building included fully stripping and re-tiling the roof. Again, our team did this with carefully selected slate which matched the previous material. We propped structural timbers and replaced them because of substantial water penetration. The exposed roof boards were assessed and treated for decay. Our team selected high-performance thermal insulation because we wanted to maximise thermal efficiency within the restricted space. Alongside this, we finished the building with asphalt-lined gutters and new lead detailing for the dormer windows.

The team maintained and enhanced the building’s traditional character with the introduction of new lead coverings. We applied these to the parapet line on the north and south elevations. Following repairs, our team carefully restored ceilings using traditional lath and plaster techniques so they were in line with the period of the building.

Project Feedback

Our project management team had to make accommodations throughout the grade 2 listed building repairs. This was to ensure the important legal proceedings that take place on-site daily could go ahead without disturbance. Our client gave a testimonial to evidence the great work that was undertaken during this project, Mark Chisholm BSc (Hons) MSc Estates Department said, “I thought it appropriate that I should pass on my thanks to Carla Piedade (Site Manager) and her team for the exceptional care and professionalism shown, during what at times was a very challenging project, completed whilst the property was occupied.”

Read about more of our heritage projects, here.

Specifications

  • Structural roof repair
  • External stonework
  • Sash window repair and restoration
  • Metalwork
  • Leadwork
  • Traditional lath and plaster techniques

Thanks to Site Manager and her team for the exceptional care and professionalism shown, during a very challenging project, completed whilst the property was occupied

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks