Heritage Refurbishment Project

Sector

Heritage

Location

London

Service

Refurbishment

Axis completed a prestigious heritage refurbishment project to reinstate and preserve the features of the Great Hall at the Royal Hospital Chelsea. The Great Hall is a Grade I* listed building designed by Sir Christopher Wren in the 17th century and still serves as a working dining hall for the Chelsea Pensioners.

Heritage refurbishment project at Grade I listed Great Hall of Royal Hospital Chelsea

Project Details

Our relationship with the Royal Hospital began in 2012 when we carried out internal and external decoration projects here, one of London’s most significant historical buildings which was founded by Charles II to provide his soldiers with a home in their retirement. Our craft, care and consideration within that work was rewarded, as we were later entrusted with the refurbishment and restoration project to the Royal Hospital’s Great Hall.

Our Heritage division began by removing, protecting, and storing the Great Hall’s priceless artwork. We then started the redecorations with iron and joinery work, followed by masonry repairs. The team then moved onto marble restoration before electrical rewiring work. We also completed routine painting, as well as more specialist work including French polishing and brass reinstatement with the sensitive cleaning of all fixtures. Our team stripped back, preserved and finished the timber with a new lacquer coating prior to polishing. The timber enhances the room’s grandeur and is featured on panelling, large doors, and dining tables.

Before the project commenced, we undertook extensive research to ensure that proper materials, applications, and craftsmanship could provide a period-appropriate restoration. All of our finishes were approved by English Heritage. Our Resident Liaison Officer kept the Chelsea Pensioners informed at all stages of the heritage restoration project.

Specifications

  • Storage of priceless artifacts
  • Iron, joinery, and masonry repairs
  • Brass reinstatement
  • Marble restoration
  • Restoration of timber panelling
  • English Heritage approved finishes

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Fire Protection Upgrade – Union Central Building, Hoxton, London

Axis completed the Fire Protection Upgrade at Union Central Building in Hoxton, London, for William Martin Property Consultants Ltd, improving...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.