Contractors carrying out office reinstatement works to restore a commercial space to its original condition before lease handover.
Home | Case study | Office Reinstatement Works

Office Reinstatement Works

Sector

Retail & Commercial

Location

London

Service

Refurbishment

Axis completed an office reinstatement works programme on behalf of the Crown Estate, in the prestigious and busy district of Piccadilly Circus. Our team successfully completed the project within a fully occupied building and a live working environment.

The Crown Estate

Office reinstatement works for the Crown Estate at Venture House in Piccadilly Circus, central London, took just 20 weeks

Project Details

We took on a range of jobs within the scope of the project. We started with the reinstatement, repairs and redecoration of the full interior office accommodation, located on the second floor of Venture House. This included the removal of all the previous tenants’ installations such as the plasterboard, glazed and stud partitions. We also removed the M&E and floor finishes, before transforming the space back to its original state. The team added small power and lighting installations as well, to complement the new office configuration.

The second phase of the project involved the external refurbishment to buildings on Regent Street, Glasshouse Street, and Swallow Street. We began by cleaning and restoring the Portland stone façade, and moved on to all road facing windows and enclosed light wells. Our team erected a design scaffold to enable easy access to the repairs work. We removed the paint finish to the stone on the exterior 5th storey. The bricks and stone were then cleaned according to the Crown Estates guidelines.

We rubbed down all metal and timber windows to their original condition, before repairing and repainting them. Our commercial team also carried out the roof works to Glasshouse Street, including repairs and reinstatement of the guttering system as well as renewing the lead flashing.

Project Challenges

One of the challenges in this office reinstatement works project was the location. Works took place at the busy Piccadilly Circus area of London, so our team carefully planned and liaised with the client to avoid disruption. This was essential to co-ordinate the works and, in particular, the delivery and waste disposal aspects. We successfully delivered the works on time and within budget.

Specifications

  • Strip out
  • Mechanical and Electrical
  • Portland Stone repairs
  • DOFF cleaning
  • Window and Roof Works
  • Flooring and Ceiling repairs

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Damp & Mould Remediation for Dudley Metropolitan Borough Council

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

premier inn hotel room with bed tv dinning table open wardrobe mirror entrance to ensuite

Premier Inn – Wirral Met College

We partnered with Wirral Met College to deliver a fully functioning hotel training facility - transforming a 150 sq m...

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn