A panoramic view of a high-rise tower block completely wrapped in blue scaffolding with a large Axis logo, undergoing planned improvements against a city skyline.
Home | Case study | Planned Improvement Project

Planned Improvement Project

Sector

Social Housing

Location

London

Service

Responsive Repairs

As part of our Decent Homes contract with Tower Hamlets Homes, Axis undertook planned improvements with internal and external works at Brodick House.

Tower Hamlets Homes

The planned improvements at Brodick House were valued at £7.7m across 2 years

Project Details

Brodick House, on the St Stephens Estate in Bow, London E3, is a 22-storey high rise tower of 130 flats, constructed in 1968 of precast concrete panel construction.

We began the project with Phase One, by improving the central heating and water systems within the 130 flats. As gas is not allowed in the building, we installed a new boiler house and a new Heat Interface Unit (HIU) which allows water to be pumped across the street. This provides heating and hot water to all flats. We also implemented a boosted water system to provide better water pressure for all flats across the 22 floors.

Our housing division then entered Phase Two. We focused on internal and external improvements alongside maintenance and decoration. Our specialist team removed or treated Artex walls, tiles and ceilings that contained asbestos. Next, we refitted the corridors and entrance with fresh tiling, flooring and ceilings to provide a cleaner and more welcoming environment for residents. The team then installed new doors for better security and a more appealing look.

We installed External Wall Insulation and our FRA works here included a management assessment and remedial installation works. We also installed a new guttering system on the outside of the building to provide better and more effective drainage to the balconies. Our team then fitted new windows, doors and a new roof to improve the external look and energy performance of the building. Outside of these planned phases, each flat was fitted with a new kitchen and bathroom prior to the commencement of the contract.

Project Advantages

While our works were ongoing, residents continued to occupy the flats. Our Resident Liaison Officers ensured all parties were well informed and supported throughout the process. The team also attended regular meetings with the residents during the planned improvements, to update them on the progress of the works, answer any questions and hear any concerns and suggestions.

Find more of our housing sector projects, here.

Specifications

  • Asbestos removal
  • Boiler plant house installation
  • Boosted central heating system
  • External wall insulation
  • Window and door replacement
  • Guttering and drainage

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...