Follow Us

 
An elevated view of a contemporary university campus, showing a pedestrian bridge or walkway connecting two buildings with modern yellow and dark brick facades and large glass panels, illustrating campus maintenance and access improvements.
Home | Case study | University Refurbishment Works

University Refurbishment Works

Sector

Education

Location

London

Service

Refurbishment

Axis successfully delivered university refurbishment works at a Kingston University campus. The project took place at the four-storey Sopwith Building within their Penrhyn Road Campus in Kingston-upon-Thames. The project included improved the washrooms, communal corridors and common areas, and new flooring alongside a suspended ceiling.

Kingston University

University refurbishment works at the Penrhyn Road Campus of Kingston University

Project Details

Our team gave the twelve washrooms (male, female and DDA compliant) a dynamic makeover. We installed concealed cisterns and plumbing as well as sensor pneumatic flushes and mixer taps. We also introduced high specification sanitaryware and sinks. The team provided a programme of mechanical and electrical works including rewiring and new central heating. We renewed the plumbing, air conditioning, sanitary fittings, fire doors and modern carpets. This created an improved work and study environment for staff and students which was enhanced by a new LED lighting system, fitted with motion sensor switches.

Overall, the university refurbishment works preventative and restorative nature improves the building and ensures that the areas remain fit for purpose. It also means that Kingston University can attain the optimum life span of the building from the improvements. During the 12-week programme, our team carefully scheduled so that the project was completed on time, and with minimum disruption. We incorporated fire stopping measures so that, in the event of a fire, flames and smoke would be held back for the maximum amount of time. Alongside this, we completed the ceiling and partitioning work was taking place.

Project Feedback

“The liaison officer that Axis placed on site was an example of how they went over and above. Her professional approach ensured our lecturers were informed and meant the university’s involvement was minimal and there were zero complaints – we will be introducing this practice across the board to all of our contractors and projects in the future.” Peter Knight, Kingston University.

Specifications

  • Washroom upgrades
  • Flooring and carpeting
  • Suspended ceilings
  • Interior refurbishment
  • Fire-stopping works
  • Air conditioning and central heating

The Liaison Officer placed on site was an example of how Axis went over and above. Our lecturers were informed, and the university’s involvement was minimal. There were zero complaints.

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Fieldway

Wigan Council – Fire Safety and Electrical Upgrade

Fieldway delivered a multi-disciplinary fire safety and electrical upgrade programme across seven high-rise blocks, improving safety, compliance and essential infrastructure...

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...

Rosehill Court – Full Refurbishment

£3.1m refurbishment of 59 flats and 10 commercial units at Rosehill Court, Sutton, delivered over 19 months.

The Honourable Society of Gray’s Inn, Gray’s Inn Square

These works form part of Axis's 10+ year contract with The Honourable Society of Gray’s Inn.

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...