Follow Us

 
An upward-angled view of the facades of two ornate, red brick Victorian buildings. The building on the right features terracotta or orange-painted stucco around large bay windows, highlighting the historic property renovation.
Home | Case study | Victorian Property Renovation

Victorian Property Renovation

Sector

Heritage

Location

London

Service

Refurbishment

Axis successfully completed a Victorian property renovation project at Herbert Mansions, a 4-storey block of apartments in the prestigious Knightsbridge area of London. We carried out external and internal repairs and redecoration works whilst the flats remained occupied. The properties are situated on Sloan Street and Pavillion Road, above high-end shops.

Axis delivered repairs and redecoration works at a 4-storey block of occupied apartments on Sloan Street

Project Details

Our heritage team took on a scope of works which comprised of metal, masonry, pipe and gutter repairs. We also introduced new lead flashing and made repairs to the windows. We carried out specialist timber restoration and redecoration work to the doors and the front entrance. The team completed this alongside the creation of a painted ornate stencil. We also completely restored the mosaic. The team repaired exterior cement fillets and replaced the steps of Pavilion Road, with a new staircase constructed to the exterior of Sloane Street.

The team programmed and executed a strip out, repair and refurbishment to the interior of Sloane Street. However, our work caused minimal disruption to the dental practice and the occupied residents of the building. We refurbished the lift compartment with a specialist paint spray finish to the lift door. Our interior works also included timber repair, joinery, and the installation of new lighting.

As part of the Victorian property renovation, our team also redecorated to the lobby with a bespoke radiator cabinet made of tulipwood and a decorative grill. We also installed six NR lockable post boxes and a black Carrara marble shelf. We completed the works across a 16-week period.

Specifications

  • Stone masonry repairs
  • Pre-decoration repairs
  • Concrete demolition
  • Decorations and carpentry
  • Mosaic restoration
  • Specialised artistry painting

Our Heritage division took on the task of renovating a 4-storey Victorian block of apartments across a 16-week period

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Grey slate tiled roof with windows

Alliance Norse – Automatic Opening Vent Installation

Fieldway completed the Automatic Opening Vent Installation for Alliance Norse at Grade II listed Glossop Market Hall in Derbyshire, improving...

newly installed kitchen in remodelled kitchen showing upper and lower cupboards, oven and washing machine

Peabody – Landor Road Assisted Living Remodel

Axis delivered the full refurbishment and remodelling on Landor Road, to a Victorian terraced property in South London, transforming the...

Fieldway

Wigan Council – High-Rise Fire Safety Retrofit

Fieldway delivered a multi-disciplinary fire safety retrofit programme across seven high-rise blocks, improving safety and compliance for more than 700...

Cypress Court – Cladding Remediation Project Update

Axis is making strong progress on a £5.25m cladding remediation project at Cypress Court, replacing combustible materials with compliant, non-combustible...

Fire Protection Upgrade – Union Central Building, Hoxton, London

Axis completed the Fire Protection Upgrade at Union Central Building in Hoxton, London, for William Martin Property Consultants Ltd, improving...

Westminster City Council – Lydford Community Hall

These works were delivered by Axis on behalf of Westminster City Council to improve the condition, functionality and longevity of...

City of London – Energy Efficiency Upgrade – Dairy Farm

Axis delivered a comprehensive refurbishment and energy efficiency upgrade to Dairy Farm, a detached three-bedroom property within Epping Forest, on...

Manor Court Refurbishment Programme with A2Dominion

Axis delivered a £6m refurbishment, fire compliance and retrofit programme at Manor Court, Surrey, improving safety, thermal performance and resident...

Inside a lodge sitting room. Brown chairs looking over of a large door with windows. Wooden table behind. Brown light fixture on the ceiling. Another window on the other wall. White walls. Wooden floor

City of London Corporation – Refurbishment and Energy Efficiency Upgrade

Axis delivered lodge refurbishments and energy efficiency updates for City of London Corporation.

Westminster City Council- Millennium Centre

Westminster City Council – Millennium Community Centre

These works were delivered by Axis on behalf of Westminster City Council to enhance the sustainability, energy efficiency and functionality...

solar panels on grey asphalt roof

London Borough of Hounslow – Solar PV and LED

Axis delivered the London Borough of Hounslow Solar PV, LED and Roof Repairs Programme, improving energy efficiency and reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington - Planned Refurbishment & Building Safety Improvement Programme

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Eldon Housing Association – Care Facilities, London and Croydon

Axis delivered a fire safety improvement programme across four occupied Eldon Housing Association care schemes in London.

Eastlight Community Homes – Solar PV, Millers Row

Axis’ M&E team installed Solar PV systems to 10 Eastlight Community Homes residential properties in Essex, improving EPC ratings, reducing...

Newquay House Major Refurbishment for L&Q

Axis delivered major refurbishment works at Newquay House in London, restoring a Grade II listed residential block while improving energy...

Leeds City Council – Multi-site Decarbonisation Programme

Axis supports Leeds City Council’s ambition to become the UK’s first Net Zero and Nature Positive city by reducing carbon...

Notting Hill Genesis – Castletown Road, West Kensington

These works form part of Axis’s refurbishment programme for Notting Hill Genesis at Castletown Road, focused on improving accessibility, comfort...

Overhead shot of three high rise buildings covered in scaffolding

Lewisham Park Towers – Major Investment Programme

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q Housing Association.

Dudley Metropolitan Borough Council -Damp & Mould Remediation

Axis delivers damp and mould remediation for Dudley MBC across 21,000 homes, improving living conditions and achieving 100% compliance.

CLC employee scanning a wall for damp and mould

Riverside – Damp and Mould Remediation Programme

Axis CLC delivers a specialist damp and mould remediation programme for The Riverside Group in West Bromwich. The team provides...