Restoration and Refurbishment Project

Sector

Heritage

Location

London

Service

Refurbishment

Axis was employed on behalf of the client by project managers, Davenport Associates Residential Building Consultancy, for External and Internal Restoration and Refurbishment works at a Grade I Listed property in Belgrave Square, London. Our heritage division worked alongside Formation Architects, the Contract Administrators, and Constructure, the Structural Engineers, on this project.

Private

Axis successfully delivered enablement works at the value of £940,000

Project Details

The property, which is located in Belgravia, near Grosvenor Place and Hyde Park corner lies in one of London’s most prestigious postcodes. The Grade listed property was built between 1826 and 1828 and is a large, stucco-fronted Georgian mid-terrace townhouse. Belgrave Square is the principal townscape in the Belgravia Conservation Area within the City of Westminster. It is essential that all historical building fabric to be retained is protected during the works.

Our team began the scope of restoration and refurbishment works with an internal demolition and strip-out. This came alongside other enabling works, with the preparation of the site in readiness for the first stage of development. We moved onto the structural repairs of the building. Our team completed specialist heritage brickwork repairs to the rear parapet walls of the property, to a very high-quality standard. This came alongside timber investigation works and joist repairs. The team also worked on the protection of the original features, such as decorative plaster cornice and ceilings.

Our team installed the steel framework lift shaft and worked alongside sub-contractors and suppliers, who provided manufacturing drawings for sign off to the design team. We lowered the pavement vaults and underpinned the basement vaults, alongside providing Delta waterproofing to the area.

Additional items of work added to the scope by the team included erecting access scaffolding to the rear of the property. We removed the chimney and stack at the 4th-floor level, as well as removing debris from between floor voids, with additional party wall awards required to be put in place.

Project Challenges

Our team faced a number of technical challenges, this included temporarily propping up steelwork to the rear elevation of the property. We underestimated the extent of timber rot found in the building and had to support and protect two cantilever stone staircases. Defective batches of intumescent paint had to be removed from the steelwork by sandblasting and re-applied.

Another challenge in this restoration and refurbishment project was seasonal. Our team used lime mortar for all masonry work, which is difficult to lay in cold temperatures. During the winter, days under 6°C prevented our mortar work.

Find more of our heritage sector projects, here.

Specifications

  • Demolition and enabling works
  • Specialist heritage brickwork repairs
  • Timber investigation works and joist repairs
  • Underpinning and waterproofing basement vaults
  • Protection of original decorative features
  • Installation of structural steelwork for lift shaft

Planned repairs services

Looking for more information about Axis’ repair services? Click below to find out more.

020 756 42100
info@axiseurope.com

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

View or share this case study

Download

You may also be interested in...

Roof and Solar PV Replacement

A £1.4 million roof retrofit and solar PV installation enhancing energy efficiency, sustainability, and overall building performance

Full Refurbishment

Our full bespoke refurbishment of the Metropolitan Police Vehicle Workshops was completed in 6 months to the satisfaction of our...

An aerial photo showing the clear difference between a newly replaced, dark brown tiled roof (left) and an old, weathered grey tiled roof (right) on a brick terraced house, demonstrating the result of roof renewal and repair.

Roof Repairs and Maintenance Works for MHS

Reactive Roof Repairs and Maintenance Works programme weatherproofs and futureproofs MHS' residential dwellings in Kent

Harrogate and District NHS Foundation Trust

We delivered a £1.4m multi-site refurbishment for Harrogate and District NHS Foundation Trust transforming clinical and support spaces across Grove...

Midlands Partnership NHS Foundation Trust

We upgraded or replacement over 400 fire doors at the inpatient Mental Health Services and Old Age Psychiatry facility.

A close-up of newly installed black solar PV panels on a tiled roof, showing the reflective, crystalline surface and the clean installation edge over the brown roof tiles.

Solar Panels Eastlight Community Homes

Our 3-week Solar PV installation programme brings energy efficiency and cost saving benefits to Eastlight residents

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

National Property and Construction Management Consultancy team overseeing large-scale housing projects across the UK.

Planned Cyclical Maintenance

Delivering planned cyclical maintenance on multiple properties in West London for Notting Hill Genesis. This improved energy efficiency.

Alnwick District Playhouse Trust

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

A view of the multi-storey brick care home from its communal garden, showing the new conservatory and peaceful patio area with benches.

Communal Repairs and Decoration Works

Delivering communal repairs and decoration, enhancing communal areas, guestrooms and a garden for Notting Hill Genesis.

Construction workers in high-visibility vests and hard hats stand on a large, newly boarded timber roof structure under an extensive temporary roof scaffolding system, indicating major roof renewal programme work.

Roof Renewal Programme

Axis' major Roof Renewal programme over 20 weeks for Notting Hill Genesis waterproofed the property and increased thermal efficiency

A modern refurbished office corridor featuring black-framed Crittall-style glass walls and contemporary circular LED pendant lights, which are reflected in the glass.

Re-modelling and refurbishment of office space

Axis' extensive refurbishment project creates modern, practical working space in heritage building for The Honourable Society of Gray’s Inn

The historic Grade II listed Thames Tunnel Mills building, a former warehouse converted to residences, viewed from the riverside on a sunny day.

Grade II residential building upgrade

Axis delivered this Grade II residential building upgrade at Thames Tunnel Mills on the banks of the Thames for L&Q

The exterior of a converted heritage gatehouse, painted white with black doors, standing next to the arched entrance of a larger historic red brick building.

Heritage Modernisation and Conversion

Axis’ Heritage Division converts a bike storage room into an IT server room for barristers at Griffin Lodge

A close-up of a newly refurbished, black-painted heritage gate and railings at the entrance to a Royal Park, showcasing specialist conservation work.

Heritage Refurbishment for Royal Parks

Heritage Division ccompletes refurbishment programme across multiple properties in Richmond and Bushy parks

Premier Inn – Bank

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

A bright, modern, and fully refurbished kitchen with new white cabinets, black countertops, and integrated appliances after a complete fire damage restoration.

Fire-Damaged Flat Refurbishment

Delivering expert refurbishment of fire-damaged properties to restore safety, compliance, and quality living standard.

Clarion Housing Association

After a thorough procurement process, a new 20-year partnership agreement has been established between Axis’ Midlands Division and Clarion Housing...

The grand, red-brick exterior of a large heritage building, home to The Royal Parks and Metropolitan Police in Hyde Park, after a sensitive refurbishment and modernisation project.

Heritage Refurbishment and Modernisation

As Official Contractor, Axis Heritage Division refurbished and re-decorated The Old Police House within Hyde Park.

The full exterior facade of a large, multi-storey residential block in London which received a new cold water pressure booster system.

New Cold Water Pressure Booster System

A new cold water booster system to improve a residential property's water pressure, efficiency and cost savings for THCH.